Plus+ STS drawing
On completion of a Traffic Junction Design (STS Drawing) the Plus+ Design Layout Tool will be
used to generate the Plus+ Design Layout Configuration. This configuration can either be
imported directly to a controller or passed to the Plus+ Installation App.
The STS drawing contains all the pertinent information for on- street cable connections and should be
referred to accordingly.
When a Traffic Junction is being built up, within a depot or out on street, the Plus
+
Installation App
provides an easy method (scanning) to populate the Plus+ Design Layout Configuration with the
serial numbers of the relevant Nodes.
It is this mapping between Nodes, having a defined function, and the serial number of the physical
Node that is going to implement the function that ensures the configuration from IC4 is
implemented in the controller when on street.
Further information on using the Plus
+
Design Layout Tool can be found in the Plus
+
Design Layout
Tool Quick Start Guide 667/HQ/53000/200.
Further information on using the Plus
+
Installation App can be found in the Plus
+
Installation App
Quick Start Guide 667/HQ/53000/300.
Plus
+
: Key Considerations
2.4.1
Reserve State
The reserve state, in Plus+, is slightly different from the standard ST950 controller.
•
Ped Phases are no longer inhibited
•
The user can now add and should include Ped stages in the Fixed Time sequence.
•
Audible devices all switched off
•
Tactile devices continue to operate, but ignore tactile disable from S/C using SCTACDIS
•
I/O still unavailable so Wait / Demand Indicators illuminate and on-crossing clearance
periods run to max.
Note that the IC4 defaults for Reserve State have not been changed for Plus+ Controllers, so:
•
junctions with RLM configured to extinguish streams (typically part-time junctions) are still
extinguished by default
•
stand-alone pedestrian crossings are held at vehicle green / pedestrian red.
2.4.2
Red Lamp Monitoring
When the IC4 configuration is being compiled the user may see a warning message: “
For Plus+
Controllers it is recommended that RLM RLF1/RLF2 actions are NOT latched until manually reset