ENTRANCE GATE INSTALLATION AND SETUP
4-14
SIG-QG-21-01
NOVEMBER 2021
Version: A
4.2.5 Final Inspection
A.
Voltage at terminal posts 4 and 5
- should be no less than 9 volts DC and no more than 36 volts
DC.
B.
Check for possible grounds.
C.
Check voltage and current during operation.
The voltage on terminals 4 & 5 should
never drop below 11 volts
during the gate up cycle.
The gate up current at the mechanism should be 6-15 amps (longer arms require more current).
Power down current should be 6-15 amps.
D.
Check ascending and descending times.
Validate ascend and descend times with the values that were programmed during the installation.
Measured times should be within 1 second of the programmed times. This can be verified by using
a stop-watch or the timer on a mobile device.
E.
Brake air gap -
using Air Gap Tools (part numbers NYK:074070-C and NYK:074070-D), verify air
gap is no less than 0.015”, and no more than 0.020”.
WARNING
WHEN PLACING THE GATE IN SERVICE, OBSERVE PROPER
OPERATION WITH TRAIN ACTIVATION OF THE CROSSING AND
PERFORM ANY ADDITIONAL TESTS IN ACCORDANCE WITH
RAILROAD PROCEDURES.
Содержание SMART GATE S-80
Страница 44: ...PROGRAMMING 5 6 SIG QG 21 01 NOVEMBER 2021 Version A This Page Intentionally Left Blank ...
Страница 52: ...PROGRAMMING 7 6 SIG QG 21 01 NOVEMBER 2021 Version A This Page Intentionally Left Blank ...
Страница 54: ...HARDWARE TORQUE GUIDELINES 8 2 SIG QG 21 01 NOVEMBER 2021 Version A This Page Intentionally Left Blank ...