•
Start by 3-pole trip command of the external protection :
Binary input functions
>BF Start 3pole
and if necessary
>BF release
(in spontaneous or fault indi-
cations). Trip command (dependent on settings).
Switch off test current.
If start is possible without current flow:
•
Starting by trip command of the external protection without current flow:
Binary input functions
>BF Start w/o I
and if necessary
>BF release
(in spontaneous or fault indi-
cations). Trip command (dependent on settings).
Busbar tripping
The most important thing is the check of the correct distribution of the trip commands to the adjacent circuit
breakers in case of breaker failure.
The adjacent circuit breakers are those of all feeders which must be tripped in order to ensure interruption of
the fault current should the local breaker fail. These are therefore the circuit breakers of all feeders which feed
the busbar or busbar section to which the feeder with the fault is connected.
A general detailed test guide cannot be specified because the layout of the adjacent circuit breakers largely
depends on the system topology.
In particular with multiple busbars the trip distribution logic for the surrounding circuit breakers must be
checked. Here check for every busbar section that all circuit breakers which are connected to the same busbar
section as the feeder circuit breaker under observation are tripped, and no other breakers.
Tripping of the Remote End
If the trip command of the circuit breaker failure protection must also trip the circuit breaker at the remote
end of the feeder under observation, the transmission channel for this remote trip must also be checked. This
is done together with transmission of other signals according to Sections “Testing of the Teleprotection
Scheme with ...” further below.
Termination of the Checks
All temporary measures taken for testing must be undone, e.g. especially switching states, interrupted trip
commands, changes to setting values or individually switched off protection functions.
Current, Voltage, and Phase Rotation Testing
≥ 10 % of Load current
The connections of the current and voltage transformers are tested using primary quantities. Load current of
at least 10 % of the nominal current of the device is necessary. The line is energized and will remain in this
state during the measurements.
With proper connections of the measuring circuits, none of the measured-values supervision elements in the
device should pick up. If an element detects a problem, the causes which provoked it may be viewed in the
Event Log.
If current or voltage summation errors occur, then check the matching factors (see Section
Messages from the symmetry monitoring could occur because there actually are asymmetrical conditions in
the network. If these asymmetrical conditions are normal service conditions, the corresponding monitoring
functions should be made less sensitive (see Section
Quantities
Currents and voltages can be viewed in the display field on the front of the device or the operator interface via
a PC. They can be compared to the actual measured values, as primary and secondary quantities.
If the measured values are not plausible, the connection must be checked and corrected after the line has
been isolated and the current transformer circuits have been short-circuited. The measurements must then be
repeated.
3.3.6
Mounting and Commissioning
3.3 Commissioning
SIPROTEC 4, 7VK61, Manual
215
C53000-G1176-C159-5, Edition 05.2018
Содержание SIPROTEC 4 7VK61
Страница 8: ...8 SIPROTEC 4 7VK61 Manual C53000 G1176 C159 5 Edition 05 2018 ...
Страница 10: ...10 SIPROTEC 4 7VK61 Manual C53000 G1176 C159 5 Edition 05 2018 ...
Страница 16: ...16 SIPROTEC 4 7VK61 Manual C53000 G1176 C159 5 Edition 05 2018 ...
Страница 176: ...176 SIPROTEC 4 7VK61 Manual C53000 G1176 C159 5 Edition 05 2018 ...
Страница 224: ...224 SIPROTEC 4 7VK61 Manual C53000 G1176 C159 5 Edition 05 2018 ...
Страница 264: ...264 SIPROTEC 4 7VK61 Manual C53000 G1176 C159 5 Edition 05 2018 ...
Страница 270: ...270 SIPROTEC 4 7VK61 Manual C53000 G1176 C159 5 Edition 05 2018 ...
Страница 276: ...276 SIPROTEC 4 7VK61 Manual C53000 G1176 C159 5 Edition 05 2018 ...
Страница 346: ...346 SIPROTEC 4 7VK61 Manual C53000 G1176 C159 5 Edition 05 2018 ...