Commissioning
6.2 Checklists for commissioning
1PH808/1PH810 main motors
112
Operating Instructions, 04/2017, 610.48004.40f
Table 6- 5
Checklist (5) – checks regarding the cooling system
Check
OK
Water cooling
Has the cooling water supply been connected and is it ready for operation?
Is the cooling water circulation (flow rate, temperature) in compliance with the
specifications?
Forced ventilation
Have you checked all safety-related and function-relevant details?
Examples:
•
Have you compared the data of the external cooling unit with the supply data?
It is not permissible that the external cooling unit is connected if the supply data
deviates from the data of the external cooling unit to such an extent that an overload
condition would occur.
•
Is the electrical installation of the external cooling unit, including accessories OK,
e.g. has the protective conductor been connected?
•
Are the mechanical installation and electrical installation of the safety-relevant
components OK? These include the installation of a circuit breaker and attaching
protective guards.
•
Are the cable entry glands correctly sealed?
•
Are the fan air intake and the area around the fan blades free of foreign bodies?
•
Does the fan have the correct direction of rotation?
An arrow is stamped on the fan rating plate. This arrow indicates the correct direc-
tion of rotation of the fan. An arrow is also marked on the fan blades. When the fan
starts, you can visually check the direction of rotation using the arrows. The fan
functions correctly if the direction of rotation matches the direction of the arrow on
the fan rating plate.
Table 6- 6
Checklist (6) – checks regarding the optional brake
Check
OK
Does the brake open when the operating voltage is connected?
Does the brake open and close correctly?
Table 6- 7
Checkliste (7) – checks regarding roller bearings
Check
OK
Are the roller bearings OK?
For motors that were stored, were the storage conditions according to Chapter
"Storage" and the bearing change intervals according to Chapter "Bearing change
interval" complied with?
Содержание SIMOTICS M-1PH8
Страница 1: ......
Страница 2: ......
Страница 8: ...Introduction 1PH808 1PH810 main motors 8 Operating Instructions 04 2017 610 48004 40f ...
Страница 12: ...Table of contents 1PH808 1PH810 main motors 12 Operating Instructions 04 2017 610 48004 40f ...
Страница 40: ...Description 2 4 Structure 1PH808 1PH810 main motors 40 Operating Instructions 04 2017 610 48004 40f ...
Страница 118: ...Commissioning 6 6 Cooling 1PH808 1PH810 main motors 118 Operating Instructions 04 2017 610 48004 40f ...
Страница 124: ...Operation 7 2 Non operational periods 1PH808 1PH810 main motors 124 Operating Instructions 04 2017 610 48004 40f ...
Страница 144: ...Maintenance 8 2 Corrective maintenance 1PH808 1PH810 main motors 144 Operating Instructions 04 2017 610 48004 40f ...
Страница 147: ...Spare parts 1PH808 1PH810 main motors Operating Instructions 04 2017 610 48004 40f 147 Figure 9 1 Spare parts example ...
Страница 148: ...Spare parts 1PH808 1PH810 main motors 148 Operating Instructions 04 2017 610 48004 40f ...
Страница 185: ......
Страница 186: ......