Safety Engineering in SIMATIC S7
System Manual, 04/2006, A5E00109529-05
Index-1
Index
1
1oo1 evaluation, 5-2, 5-3
1oo2 evaluation, 5-2, 5-5
A
Acceptance test
of system, 4-7
Access
Access protection, 4-2, 4-7
Acknowledgment
Application block
F_RCVDP, 3-14, 3-15
Application template
Graphics-based, 7-7
Approvals, 4-8
Area of application
S7 Distributed Safety, 1-5
S7 F/FH Systems, 1-6
Automation system
Fail-safe, see F-system, 1-1
Availability, 1-7
Increasing, 2-9, 5-4, 5-7, 5-10
Limits with redundant switched I/O, 2-21
Limits with single-channel I/O, 2-14, 2-17
Limits with single-channel switched I/O, 2-19
of F-system, 2-22
B
C
Category (Cat.), 2-8, 5-1
Achievable, 1-3, 2-23, 4-12, 5-2, 5-12
Central module, see F-CPU, 1-11
Chart, see CFC, 7-9
Coexistence
of fail-safe and standard components, 2-7
Cold restart, 4-6
Combining
of fail-safe and standard components, 2-7
Communication
between F-CPU and F-I/O, 3-6
between F-CPUs, 1-8, 3-13
between F-runtime groups, 3-5
between standard user program and safety
program, 3-3
between standard user programs, 3-1
F-blocks for (S7 F/FH systems), 7-11
Monitoring time for, A-5, A-6, A-7, A-11, A-13,
Safety-related, 3-2
Safety-related I-slave-slave communication, 3-8
Standard communication between CPU and
via S7 connections (Distributed Safety, 3-18
via S7 connections (S7 Distributed Safety, A-7
via S7 connections (S7 F/FH systems, 3-20
Configuration
Distributed, 2-11, 2-13
of F-systems, 2-1
of STEP 7 project, 7-2
S7 Distributed Safety, 2-2
S7 F Systems, 2-5
S7 FH Systems, 2-6
Configuration example
S7 Distributed Safety, 2-3
S7 F Systems, 2-6
S7 FH Systems, 2-7
Configuration in RUN, see CiR, A-4, A-9
Configuration options
Depending on availability, 2-9