Commissioning
The commissioning guide below explains the individual steps for commission-
ing the OP27 and OP37. Figure 14-1 provides a diagram of the most important
steps for initial startup, recommissioning and normal operation of the OP.
Transfer configuration data to the OP
COM1/2
Set the OP to Download mode in the
startup phase (refer to Section 14.2)
Switch on the OP power supply
Initial startup
Neither a configuration nor
firmware is available on the
OP.
Recommissioning
The OP already has a config-
uration but must now use a
new configuration or firmware.
Normal operation
The OP is operated with the
loaded configuration.
Start screen
ProTool
IF2
OP
Figure 14-1 Commissioning flowchart
Flowchart