Installation, connection, commissioning, removal
3.3 Installing and connecting
SIMATIC CP 4163-1
28
Operating Instructions, 12/2022, C79000-G8976-C588-01
Installation and connecting
NOTICE
Read the SIMATIC S7-4100, Controller system manual
Prior to installation, connecting and commissioning, read the corresponding sections in the
"SIMATIC S7-4100, Controller system manual"; see /2/ (Page 49). You will also find
information on the permitted slots of CPs here.
With installation via U-connectors, make sure that the power supply is turned off when
installing/uninstalling the devices.
Installation in the SIMATIC S7-4100 system is possible in the following variants:
•
Via bus module in the rack
•
Via U-connector
Procedure for installation and connection
Step
Execution
1
When installing and connecting, follow the description for installing communications processors in the "SIMATIC
S7-4100, Controller system manual".
2
Connect the CP to Industrial Ethernet via the RJ45 socket.
Where necessary, connect another component to the remaining free RJ45 socket.
For the assignment of the interface and the maximum permissible cable lengths, see section Technical
specifications (Page 39).
3
Turn on the power supply for the first commissioning.
4
Close the front panel of the module and keep it closed during operation.
The remaining steps in commissioning involve downloading the configuration data, see
section Commissioning (Page 29).
3.3.1
Connection: Slots and modules
Connectors
The respective modules are connected to one another via the connections of the slots and
the modules of the SIMATIC S7-4100.
The connections on the different modules are the same.
Содержание SIMATIC CP 4163-1
Страница 8: ...Preface SIMATIC CP 4163 1 8 Operating Instructions 12 2022 C79000 G8976 C588 01 ...
Страница 22: ...LEDs connections QR code 2 4 QR code SIMATIC CP 4163 1 22 Operating Instructions 12 2022 C79000 G8976 C588 01 ...
Страница 50: ...Bibliography 5 SIMATIC CP 4163 1 50 Operating Instructions 12 2022 C79000 G8976 C588 01 ...