
Setup phase
After the installation and the first power-on of the SIMATIC CN 4100 communication system,
SIMATIC CN 4100 goes through the setup phase. The BIOS and operating system (firmware) are
set up automatically. At the end of the setup phase, the SIMATIC CN 4100 automatically reboots.
Note
Duration of the initial setup
The entire initial setup takes about 8 min.
When a BIOS update or firmware upgrade is required, the SIMATIC CN 4100 goes through the
setup phase again as part of the update.
Application (status of the LEDs):
• Status of the LEDs during BIOS update (Page 46)
• Status of the LEDs during firmware installation (Page 47)
Configuration phase
After a successful setup phase, the SIMATIC CN 4100 communication system is ready for
configuration. For this, the SIMATIC CN 4100 can be reached via its MAC address in the network.
A network connection must be established to configure the SIMATIC CN 4100.
Application (status of the LEDs):
• Status of the LEDs during system configuration (Page 48)
7.2
Phases
7.2.1
Status of the LEDs during BIOS update
Note the LED status during the BIOS update.
The following tables show the lighting of the respective LED at the respective time (in seconds).
BIOS update step 1 - LED status for successful installation
LEDs
After 1s
After 2s
After 3s
After 4s
After 5s
RUN
x
x
x
STOP
x
x
x
Master
Standby
AH failure
x
x
Commissioning
7.2 Phases
CN 4100 Communication System
46
Equipment Manual, 10/2021, A5E50871363-AA
Содержание SIMATIC CN 4100
Страница 6: ...Table of contents CN 4100 Communication System 6 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 8: ...Security information CN 4100 Communication System 8 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 50: ...Commissioning 7 2 Phases CN 4100 Communication System 50 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 56: ...Operation 8 3 LEDs of the RJ45 port CN 4100 Communication System 56 Equipment Manual 10 2021 A5E50871363 AA ...