Connecting the supply voltage to the rack
Requirement
• The supply voltage is switched off.
• The respective conductor is connected.
• Required tools:
– Cable stripper
Procedure
1. Strip off 8 to 10 mm of the cable.
2. Insert the wire as far as possible into the push-in terminal.
Result
The supply voltage is connected to the rack.
6.4.5
Disconnecting the supply voltage from the rack
Requirement
• The supply voltage is switched off.
• The respective conductor is connected.
• Required tools:
– Screwdriver size 3 to 3.5 mm
Procedure
1. Push in the spring release of the terminal as far as possible with the screwdriver.
2. Pull out the wire.
Result
The supply voltage is disconnected from the rack.
Connecting
6.4 Supply of the rack
CN 4100 Communication System
44
Equipment Manual, 10/2021, A5E50871363-AA
Содержание SIMATIC CN 4100
Страница 6: ...Table of contents CN 4100 Communication System 6 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 8: ...Security information CN 4100 Communication System 8 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 50: ...Commissioning 7 2 Phases CN 4100 Communication System 50 Equipment Manual 10 2021 A5E50871363 AA ...
Страница 56: ...Operation 8 3 LEDs of the RJ45 port CN 4100 Communication System 56 Equipment Manual 10 2021 A5E50871363 AA ...