![Siemens RVD240 Скачать руководство пользователя страница 85](http://html.mh-extra.com/html/siemens/rvd240/rvd240_basic-documentation_377338085.webp)
85/126
Siemens Building Technologies
Basic documentation RVD240
CE1P2384en
HVAC Products
23 Function block M-bus parameter
27.05.2004
The validity of the demand for heat will not be influenced. The compensating variable
will not be influenced either since load management is a short-term intervention.
23.5.3 Resetting the load control signals
The controller clears all load control commands 2 hours after their activation if they
have not already been reset via M-bus. In general, a load control command will not be
reset when a setpoint is reached; this means that the command is not only executed
once, but is valid during the entire duration of the intervention.
23.5.4 Use on the LPB
On operating line 154, it is possible to define whether the load control signals received
via M-bus shall be used only locally or, additionally, shall be passed on via LPB in the
segment or in the entire interconnected system.
The numbers on the display have the following meaning:
Input Use
0
Only locally
1
In the same LPB segment
2
In the entire LPB system
•
When the signals are delivered in the LPB segment,
no
other device in that segment
may be connected to the M-bus!
•
When the signals are delivered throughout the LPB system,
no
other device in the
entire LPB system may be connected to the M-bus!
23.5.5 Resolution
of M-bus signals
Signal Resolution
Water temperatures
1.0 °C
Air temperatures
0.1 °C
Voltage at DC 0...10 V input
0.1 V
Caution
Содержание RVD240
Страница 12: ...12 126 Siemens Building Technologies Basic documentation RVD240 CE1P2384en HVAC Products Glossary 27 05 2004 ...
Страница 124: ...124 126 Siemens Building Technologies Basic documentation RVD240 CE1P2384en HVAC Products 27 05 2004 ...
Страница 125: ...125 126 Siemens Building Technologies Basic documentation RVD240 CE1P2384en HVAC Products 27 05 2004 ...