![Siemens RVD240 Скачать руководство пользователя страница 33](http://html.mh-extra.com/html/siemens/rvd240/rvd240_basic-documentation_377338033.webp)
33/126
Siemens Building Technologies
Basic documentation RVD240
CE1P2384en
HVAC Products
9 Function block Holiday settings
27.05.2004
9
Function block Holiday settings
9.1 Operating
lines
Line
Function, parameter
Unit
Factory setting
Range
31
Holiday period
1
1...8
32
Date of first day of holiday
--:--
01.01 ... 31.12.
33
Date of last day of holiday
--:--
01.01 ... 31.12.
9.2 Holiday
program
A maximum of 8 holiday periods per year can be programmed. At 00:00 of the first day
of the holiday period, changeover to the setpoint for frost protection / holiday mode
takes place. At 24:00 of the last day of the holiday period, the controller will change to
normal or reduced heating in accordance with the time switch settings.
The settings of each holiday period will be cleared as soon as the respective period has
elapsed.
Holiday periods may overlap. It is not necessary to observe a certain order. Depending
on the entry made on operating line 125 (assignment of d.h.w.), the holiday function will
switch off d.h.w. heating and the circulating pump.
The holiday program is only active in AUTO mode and applies to both heating circuits.
Содержание RVD240
Страница 12: ...12 126 Siemens Building Technologies Basic documentation RVD240 CE1P2384en HVAC Products Glossary 27 05 2004 ...
Страница 124: ...124 126 Siemens Building Technologies Basic documentation RVD240 CE1P2384en HVAC Products 27 05 2004 ...
Страница 125: ...125 126 Siemens Building Technologies Basic documentation RVD240 CE1P2384en HVAC Products 27 05 2004 ...