Chapter 2
Installing the Device
RUGGEDCOM RS900W
Installation Guide
12
Connecting High AC/DC Power
CAUTION!
Electrical hazard – risk of damage to equipment. Before testing the dielectric strength (HIPOT) in the
field, remove the braided ground cable connected to the surge ground terminal and chassis ground.
This cable connects transient suppression circuitry to chassis ground and must be removed in order to
avoid damage to transient suppression circuitry during testing.
NOTE
Torque all terminal connections to 0.6 N·m (5 lbf-in).
1. Connect the positive wire from the power source to the positive/live (+/L) terminal on the terminal block.
4
1
2
3
Figure 6: Terminal Block Wiring
1.
Positive/Live (+/L) Terminal
2.
Negative/Neutral (-/N) Terminal
3.
Surge Ground Terminal
4.
Braided Ground Cable
2. Connect the negative wire from the power source to the negative/neutral (-/N) terminal on the terminal block.
3. Using a braided wire or other appropriate grounding wire, connect the surge ground terminal to the chassis
ground connection. The surge ground terminal is used as the ground conductor for all surge and transient
suppression circuitry internal to the unit.
4. Connect the ground terminal on the power source to the chassis ground terminal on the device.
Содержание RUGGEDCOM RS900W
Страница 4: ...RUGGEDCOM RS900W Installation Guide iv ...
Страница 10: ...Preface RUGGEDCOM RS900W Installation Guide x Customer Support ...
Страница 14: ...Chapter 1 Introduction RUGGEDCOM RS900W Installation Guide 4 Description ...
Страница 32: ...Chapter 3 Communication Ports RUGGEDCOM RS900W Installation Guide 22 Channel Allocations for IEEE 802 11b g ...
Страница 44: ...Chapter 6 Certification RUGGEDCOM RS900W Installation Guide 34 EMC and Environmental Type Tests ...