BA 5200 EN 08/2010
6.13
Gear unit with oilsupply system
•
Remove the sockets of the suction and delivery lines prior to connecting the system.
•
Fit the system to the gear unit or install it separately in accordance with the drawings supplied in the
gearunit documentation.
•
The pipework must not be overstressed during the mounting procedure.
Observe the operating instructions for the oilsupply system.
6.14
Gear unit with oiltemperature monitoring system
•
Connect temperaturemonitoring system (evaluating instrument to be provided by customer)
electrically.
Observe the operating instructions for the temperaturemonitoring device.
6.15
Gear unit with oillevel monitoring
•
Wire oillevel monitor electrically.
Observe the operating instructions for the oillevel monitoring device.
6.16
Gear unit with heating
•
Connect temperature monitor electrically.
•
Connect heating element electrically.
Observe the operating instructions for the heating.
6.17
Gear unit with speed transmitter
•
Wire speed transmitter electrically.
Observe the operating instructions for the speed transmitter.
6.18
General notes on addon components
For operating and servicing the components described in section 6, the pertinent instruction
manuals and the specifications in section 5 must be observed.
6.19
Final work
•
After installation of the gear unit check all screw connections for tight fit.
•
Check the alignment after tightening the fastening elements (the alignment must not have been
changed).
•
Check that all the devices which have been demounted for transport reasons have been refitted.
•
Any oildrain cocks must be secured against accidental opening.
•
The gear unit must be protected against falling objects.
•
Protective devices for rotating parts must be checked for correct seating. Contact with rotating parts
is not permitted.
•
A potential equalisation in accordance with the applying regulations and directives must be carried out!
If no threaded holes for earth connection are available on the gear unit, other appropriate measures
must be taken. This work must always be done by specialist electricians.
•
Cable entries should be protected against moisture.
•
Check that protective measures have been taken!