6.4 Commissioning
and
optimizing
the capacity controller
The controller is commissioned as described in chapter 5.
If possible, it should be commissioned using only pure
superheat control.
After optimizing the control parameters as described in
section 5.5, capacity control must be configured and
parameterized. In principle, the parameters (XP, TN) of the
capacity controller are to be optimized according to section
5.5. They must always be selected such that they are con-
siderably greater than the parameters of the superheat
controller.
46/124
Building Technologies
CPS40
CE1U3372XX / H 74 319 0555 0 a
HVAC Products
22.09.2006
Содержание PolyCool CPS 40
Страница 26: ...26 124 Building Technologies CPS40 CE1U3372XX H 74 319 0555 0 a HVAC Products 22 09 2006 ...
Страница 50: ...50 124 Building Technologies CPS40 CE1U3372XX H 74 319 0555 0 a HVAC Products 22 09 2006 ...
Страница 74: ...74 124 Building Technologies CPS40 CE1U3372XX H 74 319 0555 0 a HVAC Products 22 09 2006 ...
Страница 98: ...98 124 Building Technologies CPS40 CE1U3372XX H 74 319 0555 0 a HVAC Products 22 09 2006 ...