Display messages
2 - 7
Siemens-Elema AB
SPR8-215.898.01
Page 7 of 22
MOBILETT Plus / - E/ - M
Solna, Sweden
Rev. 05
01.02
SPS-UD
CAL 14
Generator ON
The voltage in the
capacitor bank
exceeds 360 V
•
Check the voltage level in the
capacitor bank, see page 130**.
Measure at measuring points
"CAPPOS" and "CAPNEG" on D7.
•
Check if LED V12 on D7 is lit, see
page 130**.
Check all supply voltage on D7.
•
If the voltage is close to 360 V
it can depend on the charger
on D7.
If the transistor in the Buck-
converter is short-circuited,
the current will flow until fuse U8 on
D8 blows.
Replace the D7 charging unit.
USE 15
During
preparation
The exposure switch
has been in prepara-
tion position longer
than 20 s***.
•
The user has kept the exposure
release switch in preparation
position longer than 20 s*** after
the "Ready" light indicator
indicates that preparation is ready
(anode speed is correct).
•
If the fault returns continuously,
check the exposure release
handle, see page 140**.
Dis-
played
messages
Mode of
operation
Cause
Possible reason
* See section "Monitoring the kV- and mA-controls"
** Wiring diagram X037E
Tab. 1
***
Max. preparation time is 10s if FW lower than V1.2 or V1.2E.