Installation, connecting up, commissioning
3.6 Commissioning and startup of the LINK
IE/PB LINK PN IO
42
Operating Instructions, 11/2017, C79000-G8976-C393-02
3.6
Commissioning and startup of the LINK
Requirements for commissioning
Prior to commissioning the LINK, make sure that the following conditions are met:
●
The system is completely installed.
●
The communications partners are reachable.
●
The STEP 7 configuration data is complete.
●
When using a C-PLUG: The C-PLUG is plugged in.
●
The PG or engineering station with the STEP 7 configuration data is connected to the
LINK.
See section PG/PC connector (Page 37) for information on this.
Startup behavior of the LINK
Commission the LINK by first turning on the power supply. During startup the LINK behaves
as follows:
●
When starting up the first time (brand new) the LINK searches for the configuration data
in the internal memory.
The LINK changes to STOP and shows the LED pattern "Reset to factory settings", see
also section LED displays of the LINK (Page 21)
●
When starting up after a phase of operation the LINK searches for the configuration data
either on the C-PLUG (if plugged in) or in the internal memory.
For information on the startup with C-PLUG refer to the section C-PLUG (Page 38).
After startup the subsequent procedure depends on the required mode.
Commissioning the LINK
After startup - depending on the mode of the LINK - follow the steps below:
LINK in standard mode
You have the following options:
●
Optional: Assign or change the IP address
●
Download the configuration data
LINK al PROFINET IO proxy
In this mode. the following first step is necessary:
●
Assign the LINK the PROFINET device name
Following this you can take the following steps:
●
Optional: Assign or change the IP address
●
Download the configuration data
Содержание IE/PB LINK PN IO
Страница 10: ...Table of contents IE PB LINK PN IO 10 Operating Instructions 11 2017 C79000 G8976 C393 02 ...
Страница 84: ...Approvals IE PB LINK PN IO 84 Operating Instructions 11 2017 C79000 G8976 C393 02 ...
Страница 88: ...Accessories A 2 C PLUGs IE PB LINK PN IO 88 Operating Instructions 11 2017 C79000 G8976 C393 02 ...
Страница 92: ...Index IE PB LINK PN IO 92 Operating Instructions 11 2017 C79000 G8976 C393 02 ...