LEDs, connectors, buttons
2.5 Maintenance mode
IE/PB LINK PN IO
Operating Instructions, 11/2017, C79000-G8976-C393-02
29
Operating mode
before pressing the
button
Pressing the button
Effect
Maintenance mode Press the button twice briefly within 5
seconds
The LINK restarts.
Following this the LINK remains ready
for new firmware for 10 seconds, see
also section Loading firmware
(Page 71).
Maintenance mode Press the button for at least 10 sec-
onds
The LINK is reset to the factory set-
tings.
Note that configuration data is deleted
when you reset, refer to the section
Содержание IE/PB LINK PN IO
Страница 10: ...Table of contents IE PB LINK PN IO 10 Operating Instructions 11 2017 C79000 G8976 C393 02 ...
Страница 84: ...Approvals IE PB LINK PN IO 84 Operating Instructions 11 2017 C79000 G8976 C393 02 ...
Страница 88: ...Accessories A 2 C PLUGs IE PB LINK PN IO 88 Operating Instructions 11 2017 C79000 G8976 C393 02 ...
Страница 92: ...Index IE PB LINK PN IO 92 Operating Instructions 11 2017 C79000 G8976 C393 02 ...