Installation, connecting up, commissioning
3.5 C-PLUG
IE/PB LINK PN IO
Operating Instructions, 11/2017, C79000-G8976-C393-02
39
The slot for the C-PLUG is located on the front: Insert the C-PLUG in the intended
receptacle.
Remove the C-PLUG only if there is a fault on the basic device. Remove the C-PLUG from
the receptacle using a screwdriver.
Operating response with the C-PLUG inserted
Status / procedure
Response when adopting data / actions Result after startup
Operation without C-PLUG
•
Internal memory empty
•
No C-PLUG inserted
Configuration data is adopted from the
STEP 7 project, Method of adoption
dependent on the mode:
•
Use as a gateway: Configuration
data is transferred using the down-
load function of STEP 7.
•
Use as PROFINET IO device: Con-
figuration data is transferred from
the PROFINET IO controller.
The LINK runs with the configuration
data transferred to the internal
memory.
1)
Operation with C-PLUG
•
Internal memory empty
•
Empty C-PLUG is plugged in
Configuration data is adopted from the
STEP 7 project, Method of adoption
dependent on the mode:
•
Use as a gateway: Configuration
data is transferred using the down-
load function of STEP 7.
•
Use as PROFINET IO device: Con-
figuration data is transferred from
the PROFINET IO controller.
The LINK runs with the configuration
data transferred to the C-PLUG.
1)
•
Internal memory empty
•
C-PLUG with valid configuration
data is plugged in.
2)
Result after startup; The LINK runs with
the configuration data stored on the C-
PLUG.
The LINK runs with the configuration
data existing on the C-PLUG.
1)
LINK has a C-PLUG inserted after operating without a C-PLUG
•
Internal memory with configuration
data
•
C-PLUG with different but valid
configuration data is plugged in.
2)
•
LINK is to run with data from the C-
PLUG instead of with the internal
data.
The power for the LINK must be turned
off and on again.
The LINK starts up with the configura-
tion data on the C-PLUG.
The configuration data in the internal
memory is deleted.
The LINK runs with the configuration
data adopted from the C-PLUG.
1)
Содержание IE/PB LINK PN IO
Страница 10: ...Table of contents IE PB LINK PN IO 10 Operating Instructions 11 2017 C79000 G8976 C393 02 ...
Страница 84: ...Approvals IE PB LINK PN IO 84 Operating Instructions 11 2017 C79000 G8976 C393 02 ...
Страница 88: ...Accessories A 2 C PLUGs IE PB LINK PN IO 88 Operating Instructions 11 2017 C79000 G8976 C393 02 ...
Страница 92: ...Index IE PB LINK PN IO 92 Operating Instructions 11 2017 C79000 G8976 C393 02 ...