
Siemens AG
SPR2-330.815.01.03.02
ARCADIS Avantic
12.06
CS PS SP
Final Work Steps
47
Page 47 of 66
Medical Solutions
•
If specified in the system test protocol, read off the measuring equipment used at the
factory for the protective conductor test.
¹
Enter this measuring equipment in the "Protective conductor resistance" proto-
col, in the "Measuring device, type:" row.
•
If specified in the system test protocol, read off the identification of the measuring
equipment specified in the test protocol.
¹
Enter the ID of the measuring equipment in the "Protective conductor resistance"
protocol, in the "Measuring device, Ser. No.:" row.
•
Mark the following rows in the "Protective conductor resistance" protocol with "n.a." as
"not applicable":
¹
Row "Meas. inst. calibrated up to:"
¹
Row "Evaluation:"
•
Complete the following rows in the "Protective conductor resistance" protocol:
¹
In the row "Date:" enter the current date.
¹
In the "Name" row, enter your name in block letters.
¹
Sign the protocol in the "Signature" row.
•
If you want to complete the protocol with additional remarks, enter them in the
"Remarks" table in the protocol addendum.
Protective conductor resistance test during start-up (if necessary)
NOTE
If covers were opened while installing the system and/or addi-
tional components (e.g. options) were installed or modified, the
protective conductor resistance value recorded in system test
protocol 1 is invalid.
The protective conductor resistance test has to be performed
after closing all covers.
NOTE
Observe the instructions for the protective conductor resistance
test in the "General Information" chapter of these instructions.
•
Perform the protective conductor resistance test.
¹
The protective conductor resistance must not exceed 0.2 ohms at any measure-
ment point.
•
Complete the "First measured value" column of the "Protective conductor resistance"
protocol.
•
If you want to complete the protocol with additional remarks, enter them in the
"Remarks" table in the protocol addendum.