
Siemens AG
SPR2-330.815.01.03.02
ARCADIS Avantic
12.06
CS PS SP
General Startup
23
Page 23 of 66
Medical Solutions
2-
2General Startup
Power Connection
0
Measuring the local line voltage
0
•
Measure the voltage and frequency at the intended outlet for the ARCADIS Avantic sys-
tem.
•
Compare the measured line voltage with the line voltage label on the back of the moni-
tor cart.
¹
The measured voltage (+/- tolerance) has to correspond to the voltage read from
the label.
Adapting the programmed system line voltage
0
NOTE
Perform this procedure only if the on-site line voltage does not
correspond to the programmed line voltage of the system deliv-
ered.
NOTE
After the line voltage is adapted, the leakage current values
recorded in the system test protocol are no longer valid.
After closing all covers and successfully performing a protective
conductor test, repeat and document the device leakage current
measurement.
Observe the leakage current measurement instructions in the
"General Information" chapter of these instructions.
WARNING
Danger high voltage!
Disregarding safety precautions can result in death or serious
bodily injury.
¹
Before the line voltage is adapted, the power plug on the
UPS in the monitor cart must be pulled out, since the
monitor cart is not free of voltage after the power plug is
pulled out.
•
Remove the back and bottom covers
from the monitor cart.
•
Pull the power plug out of the UPS in the monitor cart.
•
Adapt the voltage by changing the connections to transformers T1 and T2. Refer to the
ARCADIS Avantic wiring diagram.