SD39EAM-1r4
Installation
September 2005
2-23
Table 2–3 Unterminated I/O Cable
J1, PIN
P2, PIN
WIRE/STRIPE
COLOR
WIRE
IDENT
J1,
PIN
P2,PIN
WIRE/STRIPE
COLOR
WIRE
IDENT
A2
75
WH/BLK
PWR 1
A20
56
GRN/WH
PWR 10
C2
74
WH/RED
VIN 1
C20
57
GRN/BLK
VIN 10
E2
73
WH/BLUE
COM 1
E20
41
GRN/RED
COM 10
A4
65
WH/GRN
PWR 2
A22
16
GRN/BLUE
PWR 11
C4
49
WH/BRN
VIN 2
C22
3
GRN/BRN
VIN 11
E4
64
WH/OR
COM 2
E22
17
GRN/OR
COM 11
A6
91
WH/YEL
PWR 3
A24
6
GRN/YEL
PWR 12
C6
104
WH/VIO
VIN 3
C24
19
GRN/VIO
VIN 12
E6
0
WH/GRAY
COM 3
E24
5
GRN/GRAY
COM 12
A8
100
RED/WH
PWR 4
A26
70
OR/WH
PWR 13
C8
101
RED/BLK
VIN 4
C26
71
OR/BLK
VIN 13
E8
102
RED/BLUE
COM 4
E26
72
OR/RED
COM 13
A10
36
RED/GRN
PWR 5
A28
85
OR/BLUE
PWR 14
C10
47
RED/BRN
VIN 5
C28
98
OR/GRN
VIN 14
E10
46
RED/OR
COM 5
E28
84
OR/BRN
COM 14
A12
11
RED/YEL
PWR 6
A30
96
OR/YEL
PWR 15
C12
10
RED/VIO
VIN 6
C30
94
OR/VIO
VIN 15
E12
24
RED/GRAY
COM 6
E30
95
OR/GRAY
COM 15
A14
22
BLUE/WH
PWR 7
A32
92
YEL/WH
PWR 16
C14
8
BLUE/BLK
VIN 7
C32
78
YEL/BLK
VIN 16
E14
21
BLUE/RED
COM 7
E32
79
YEL/RED
COM 16
A16
14
BLUE/GRN
PWR 8
Shield
Wire
1
Shield
Wire
-------
C16 27 BLUE/BRN
VIN
8
E16 13 BLUE/OR COM
8
A18 44 BLUE/YEL PWR
9
C18 43 BLUE/VIO VIN
9
E18 45 BLUE/GRAY
COM
9
NOTES
:
1. Color for wire/stripe
Содержание APACS+
Страница 15: ...SD39EAM 1r4 Introduction September 2005 1 5 Figure 1 1 Enhanced Analog Module and Associated Hardware ...
Страница 16: ......
Страница 18: ...Installation SD39EAM 1r4 2 2 September 2005 Figure 2 1 Basic Local and Marshalled I O Connections ...
Страница 26: ...Installation SD39EAM 1r4 2 10 September 2005 Figure 2 3 EAM Marshalled Termination Assembly ...
Страница 27: ...SD39EAM 1r4 Installation September 2005 2 11 Figure 2 4 Marshalling Termination Panel ...
Страница 29: ...SD39EAM 1r4 Installation September 2005 2 13 Figure 2 5 Marshalled Termination Assembly Mounting and Removal ...
Страница 32: ...Installation SD39EAM 1r4 2 16 September 2005 Figure 2 7 Interconnect I O Cable Assembly and Cable Keying ...
Страница 34: ...Installation SD39EAM 1r4 2 18 September 2005 Figure 2 8 Module Keying Assignment and Installation ...
Страница 40: ...Installation SD39EAM 1r4 2 24 September 2005 Figure 2 9 Sample Input and Output Connections ...
Страница 41: ...SD39EAM 1r4 Installation September 2005 2 25 Figure 2 10 I O Cable End Preparation ...
Страница 42: ......
Страница 47: ...SD39EAM 1r4 Maintenance September 2005 3 5 Figure 3 1 Cover Plate Securing Screws ...
Страница 48: ...Maintenance SD39EAM 1r4 3 6 September 2005 Figure 3 2 User Replaceable Fuse ...