SD39EAM-1r4
Installation
September 2005
2-5
2.4.1 Predelivery
Test
An EAM that will be installed by the user is fully tested and inspected to ensure proper operation. If the
EAM is ordered factory installed in a MODULPAC or other enclosure, the EAM is tested as part of the
APACS system and inspected to ensure proper operation.
2.4.2 Factory
Shipment
EAMs to be installed by the user are placed in static shielding bags and packaged for shipment.
Accessories are packaged separately.
If the EAM is ordered factory installed in a MODULPAC or other enclosure, the enclosure is bolted to a
pallet and wrapped for protection during shipment.
2.4.3 Receipt of Shipment
All cartons should be inspected at the time of their delivery for possible external damage. Any visible
damage should be immediately recorded on the carrier’s copy of the delivery slip.
Each carton should be carefully unpacked and its contents checked against the enclosed packing list. At
the same time, each item should be inspected for hidden damage that may or may not have been
accompanied by exterior carton damage.
If it is found that some items have been damaged or are missing, notify Siemens immediately and provide
full details. In addition, damages must be reported to the carrier with a request for their on-site inspection
of the damaged item and its shipping carton.
2.4.4 Return of Equipment within North America
US Customers:
•
Call the Repair Order PAS Inside Sales/Order Management Group at (215) 646-7400, ext 4RMA
(4762) weekdays between 8:00 a.m. and 4:45 p.m. eastern time to obtain an RMA number. Mark the
RMA number prominently on the outside of the shipment.
•
When calling for an RMA number, provide the reason for the return. If returning equipment for
repair, a detailed description of failure symptoms and system behavior will be requested. Supply a
purchase order number for repairs. Follow the TSC specialist's recommendation for battery
connection, if applicable.
•
If applicable, you must supply a Material Safety Data Sheet (MSDS) with each item being returned if
it was stored or used in a location where hazardous materials were present.
Содержание APACS+
Страница 15: ...SD39EAM 1r4 Introduction September 2005 1 5 Figure 1 1 Enhanced Analog Module and Associated Hardware ...
Страница 16: ......
Страница 18: ...Installation SD39EAM 1r4 2 2 September 2005 Figure 2 1 Basic Local and Marshalled I O Connections ...
Страница 26: ...Installation SD39EAM 1r4 2 10 September 2005 Figure 2 3 EAM Marshalled Termination Assembly ...
Страница 27: ...SD39EAM 1r4 Installation September 2005 2 11 Figure 2 4 Marshalling Termination Panel ...
Страница 29: ...SD39EAM 1r4 Installation September 2005 2 13 Figure 2 5 Marshalled Termination Assembly Mounting and Removal ...
Страница 32: ...Installation SD39EAM 1r4 2 16 September 2005 Figure 2 7 Interconnect I O Cable Assembly and Cable Keying ...
Страница 34: ...Installation SD39EAM 1r4 2 18 September 2005 Figure 2 8 Module Keying Assignment and Installation ...
Страница 40: ...Installation SD39EAM 1r4 2 24 September 2005 Figure 2 9 Sample Input and Output Connections ...
Страница 41: ...SD39EAM 1r4 Installation September 2005 2 25 Figure 2 10 I O Cable End Preparation ...
Страница 42: ......
Страница 47: ...SD39EAM 1r4 Maintenance September 2005 3 5 Figure 3 1 Cover Plate Securing Screws ...
Страница 48: ...Maintenance SD39EAM 1r4 3 6 September 2005 Figure 3 2 User Replaceable Fuse ...