SD39EAM-1r4
Installation
September 2005
2-7
•
Identify ten alignment pins located below the MODULRAC frame that span the width of the
MODULRAC panel. One of these pins will engage a hole located on the Termination Strip
above the MOORE logo. The left-most pin corresponds to MODULRAC slot #1.
•
The Termination Strip’s captive mounting screws can be seen projecting from the bottom of the
plastic extrusion panel.
Содержание APACS+
Страница 15: ...SD39EAM 1r4 Introduction September 2005 1 5 Figure 1 1 Enhanced Analog Module and Associated Hardware ...
Страница 16: ......
Страница 18: ...Installation SD39EAM 1r4 2 2 September 2005 Figure 2 1 Basic Local and Marshalled I O Connections ...
Страница 26: ...Installation SD39EAM 1r4 2 10 September 2005 Figure 2 3 EAM Marshalled Termination Assembly ...
Страница 27: ...SD39EAM 1r4 Installation September 2005 2 11 Figure 2 4 Marshalling Termination Panel ...
Страница 29: ...SD39EAM 1r4 Installation September 2005 2 13 Figure 2 5 Marshalled Termination Assembly Mounting and Removal ...
Страница 32: ...Installation SD39EAM 1r4 2 16 September 2005 Figure 2 7 Interconnect I O Cable Assembly and Cable Keying ...
Страница 34: ...Installation SD39EAM 1r4 2 18 September 2005 Figure 2 8 Module Keying Assignment and Installation ...
Страница 40: ...Installation SD39EAM 1r4 2 24 September 2005 Figure 2 9 Sample Input and Output Connections ...
Страница 41: ...SD39EAM 1r4 Installation September 2005 2 25 Figure 2 10 I O Cable End Preparation ...
Страница 42: ......
Страница 47: ...SD39EAM 1r4 Maintenance September 2005 3 5 Figure 3 1 Cover Plate Securing Screws ...
Страница 48: ...Maintenance SD39EAM 1r4 3 6 September 2005 Figure 3 2 User Replaceable Fuse ...