WARNING
Rotor can fall out
If the motor is in a vertical position, the rotor can fall out while work is being performed on the
locating bearing. This can result in death, serious injury or damage.
● Support or unload the rotor when carrying out work with the machine in a vertical position.
9.4.7
Bearings
Work influencing explosion protection must be carried out by the manufacturer or by a specialist
workshop for electrical machinery authorized by the manufacturer.
See also
Safety instructions for repair work (Page 94)
9.4.7.1
Gamma ring
Depending on the particular version, a Gamma ring is installed as sealing ring.
The Gamma ring comprises an elastic, sealing sleeve and a metal housing, which are not
firmly connected with one another. The metal housing acts as thrower ring, provides protection
and maintains the sleeve at the correct position. The sleeve is kept in the housing through the
radial lift that is applied and the associated preload condition. The Gamma ring is mounted on
the shaft with a press fit, and requires no additional fastening.
Mounting the Gamma ring
1. Grease the sealing lip of the sleeve. It is not permissible that grease is applied between
the sleeve and the housing.
2. Press the Gamma ring onto the shaft by applying constant and uniform pressure. When
required, use an appropriate mounting tool.
Position the Gamma ring so that there is a play of 1 mm with respect to the flat surface of
the bearing cover.
Maintenance
9.4 Corrective Maintenance
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
Operating Instructions 06/2018
99
Содержание 1NB1402-2AA84-4CA0-Z
Страница 2: ...26 06 2018 15 34 V3 00 ...
Страница 10: ...Table of contents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 10 Operating Instructions 06 2018 ...
Страница 22: ...Description SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 22 Operating Instructions 06 2018 ...
Страница 84: ...Operation 8 9 Faults SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 84 Operating Instructions 06 2018 ...
Страница 110: ...Disposal 11 4 Disposal of components SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 110 Operating Instructions 06 2018 ...
Страница 112: ...Service and Support SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 112 Operating Instructions 06 2018 ...
Страница 117: ...117 ...
Страница 118: ...118 ...
Страница 119: ...119 ...
Страница 120: ...120 ...
Страница 121: ...121 ...
Страница 122: ...122 ...
Страница 123: ...123 ...
Страница 124: ...124 ...
Страница 125: ...125 ...
Страница 126: ...126 ...
Страница 127: ...127 ...
Страница 128: ...128 ...
Страница 129: ...129 ...
Страница 130: ...130 ...
Страница 131: ...C 2 Declaration of conformity SIMOTICS HV C 1NB1402 2AA84 4CA0 Z Operating Instructions 06 2018 131 ...
Страница 132: ...Quality documents C 2 Declaration of conformity SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 132 Operating Instructions 06 2018 ...
Страница 133: ...133 ...
Страница 148: ...148 ...
Страница 150: ...Additional documents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 150 Operating Instructions 06 2018 ...
Страница 154: ...Index SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 154 Operating Instructions 06 2018 ...
Страница 155: ...AF Einbauerklärung Loher LDX U157 AJ EC Declaration of Conformity U161 ...