5.3.3
Preconditions for smooth, vibration-free operation
Preconditions for smooth, vibration-free operation:
● Stable foundation design
● Precise alignment of the machine
● Correct balancing of parts to be fitted to the shaft end.
● Maintaining the vibration velocity according to ISO 10816‑3
5.3.4
Recommended alignment accuracy
The alignment accuracy required depends essentially on the configuration of the overall
machine train. Observe the required alignment accuracy of the coupling manufacturer in all
cases when aligning the machine.
Table 5-2
Recommended alignment accuracy
Speed
rpm
Parallel offset
mm
Angular offset
mm per 100 mm coupling diameter
750
0.09
0.09
1500
0.06
0.05
3000
0.03
0.025
5.3.5
Aligning the machine to the driven machine and mounting it
The standard flange is provided with a centering. The choice of fit for the mating flange on the
driven machine is the system manufacturer's or the plant operator's responsibility.
Note
If the machine is not fitted with a standard flange, align the machine to suit the driven machine.
Procedure
The machine axis must be vertical when it is lifted and the flange must be parallel to the mating
flange, so as to avoid seizing and stressing. Otherwise damage to the centering will result.
1. Grease the centering flange with assembly paste to make the process easier.
2. Screw in two studs into tapped holes on opposite sides of the driven machine flange. The
studs act as positioning aids.
3. Lower the machine slowly toward the driven machine and into the centering, so that the
flanges do not quite touch. Lowering too quickly risks damaging the centering.
4. If necessary, rotate the machine into the right position so that the clearance holes in the
flange are central to the tapped holes.
Assembly
5.3 Installing the machine
SIMOTICS HV C 1NB1402-2AA84-4CA0-Z
Operating Instructions 06/2018
53
Содержание 1NB1402-2AA84-4CA0-Z
Страница 2: ...26 06 2018 15 34 V3 00 ...
Страница 10: ...Table of contents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 10 Operating Instructions 06 2018 ...
Страница 22: ...Description SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 22 Operating Instructions 06 2018 ...
Страница 84: ...Operation 8 9 Faults SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 84 Operating Instructions 06 2018 ...
Страница 110: ...Disposal 11 4 Disposal of components SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 110 Operating Instructions 06 2018 ...
Страница 112: ...Service and Support SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 112 Operating Instructions 06 2018 ...
Страница 117: ...117 ...
Страница 118: ...118 ...
Страница 119: ...119 ...
Страница 120: ...120 ...
Страница 121: ...121 ...
Страница 122: ...122 ...
Страница 123: ...123 ...
Страница 124: ...124 ...
Страница 125: ...125 ...
Страница 126: ...126 ...
Страница 127: ...127 ...
Страница 128: ...128 ...
Страница 129: ...129 ...
Страница 130: ...130 ...
Страница 131: ...C 2 Declaration of conformity SIMOTICS HV C 1NB1402 2AA84 4CA0 Z Operating Instructions 06 2018 131 ...
Страница 132: ...Quality documents C 2 Declaration of conformity SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 132 Operating Instructions 06 2018 ...
Страница 133: ...133 ...
Страница 148: ...148 ...
Страница 150: ...Additional documents SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 150 Operating Instructions 06 2018 ...
Страница 154: ...Index SIMOTICS HV C 1NB1402 2AA84 4CA0 Z 154 Operating Instructions 06 2018 ...
Страница 155: ...AF Einbauerklärung Loher LDX U157 AJ EC Declaration of Conformity U161 ...