5
Mounting
5.1
Overview of mounting procedure
NOTE
The mounting procedure described here for the device meets the requirements for use
in the target system.
Additional or different requirements may become necessary in the laboratory and dur‐
ing preparation, and should be taken into account as necessary,
. If you have any questions or anything remains unclear in this regard, please
contact our service team.
•
Mounting the device.
•
Connect the cables.
•
Connecting peripheral devices.
•
Connecting the voltage supply.
5.2
Scope of delivery
•
SIM1012
•
1x grounding screw
•
1x toothed lock washer
•
Safety note
•
Optional: ordered accessories
NOTE
For a list of cables suitable for use with the device, see:
.
With special variants, where optional extras have been ordered, or owing to the latest
technical changes, the actual scope of delivery may vary from the features and illustra‐
tions shown here.
5.3
Preparing for mounting
Installation requirements
•
Select the mounting site: Plan space requirements and sufficient distance from
other devices. Be aware of the possibility of heat dissipation.
•
Unpack the device and allow to acclimatize to avoid formation of condensation.
Preparing for mounting
1.
Place the device at the mounting site.
2.
Mark the mounting holes.
3.
Proceed to drill the mounting holes.
5.4
Mounting the device
1.
Place device at mounting site.
2.
Fasten the device with at least two M6 screws (max. 6 Nm) and corresponding
washers on opposite sides of the device.
NOTICE
Use self-locking or lock nuts on mounting sites that are exposed to vibrations to
prevent the holding plates from loosening.
5
MOUNTING
14
O P E R A T I N G I N S T R U C T I O N S | SIM1012
8023514/1CC6/2021-07-28 | SICK
Subject to change without notice