4(43)
4.
Application and Operation ............................................................................ 25
4.1
Panel Description .................................................................................. 25
4.2
Machine Startup .................................................................................... 28
4.3
Machine Shutdown ............................................................................... 30
4.4
Temperature Controller 1(Used for 1HP~15HP) ................................... 30
4.4.1
Temperature setting method ...................................................... 30
4.4.2
Parameter Value Setting ............................................................ 31
4.4.3
Parameter setting method .......................................................... 31
4.4.4
Code Meanings .......................................................................... 32
4.5
Temperature Controller 2(Used for 20HP-50HP) .................................. 33
4.5.1
Temperature setting method ...................................................... 33
4.5.2
Default parameter setting ........................................................... 34
4.5.3
Parameter setting method .......................................................... 34
5.
Troubleshooting ............................................................................................ 35
6.
Repair and Maintenance ............................................................................... 37
6.1
Filling the Refrigerant ............................................................................ 39
6.2
Components Maintenance .................................................................... 40
6.2.1
Condenser .................................................................................. 40
6.2.2
Evaporator .................................................................................. 40
6.3
Maintenance Schedule ......................................................................... 42
6.3.1
About the Machine...................................................................... 42
6.3.2
Check after Installation ............................................................... 42
6.3.3
Daily Checking ........................................................................... 42
6.3.4
Weekly Checking ........................................................................ 42
6.3.5
Montly Checking ......................................................................... 42
6.3.6
Trimonthly Checking ................................................................... 43
6.3.7
Half-yearly Checking .................................................................. 43
6.3.8
Yearly Checking ......................................................................... 43
6.3.9
3 year Checking ......................................................................... 43
Table Index
Table 1-1: Specifications ..................................................................................... 9
Содержание SIC-10A
Страница 1: ...SIC A Air cooled Water Chillers Date May 2021 Version Ver B English...
Страница 2: ......
Страница 37: ...37 43 6 Repair and Maintenance...