background image

 

     

6(29) 

 

All  service  work  should  be  carried  out  by  a  person  with  technical  training  or 

corresponding  professional  experience.  The  manual  contains  instructions  for 

both handling and servicing.   

Any modifications of the machine must be approved by SHINI in order to avoid 

personal injury and damage to machine. We shall not be liable for any damage 

caused by unauthorized change of the machine. 

Our  company  provides  excellent  after-sales  service.  Should  you  have  any 

problem  during  using  the  machine,  please  contact  the  company  or  the  local 

vendor. 

Headquarter and Taipei factory

   

Tel: (886) 2 2680 9119   

Shini Plastics Technologies (Dongguan), Inc

 

Tel: (86) 769 8111 6600 

Shini Plastics Technologies India Pvt.Ltd.

 

Tel: (91) 250 3021 166 

 

Содержание SAL-430

Страница 1: ...SAL 430 460 Self contained Hopper Loader Date June 2020 Version Ver B...

Страница 2: ......

Страница 3: ...ion and Debugging 14 3 1 Installation of SAL 430 460 14 3 2 Installation Space 15 4 Application and Operation 16 4 1 Control panel description 16 4 2 Parameter Setting 18 4 3 Alarm Program 20 4 4 Para...

Страница 4: ...e 1 1 Specifications 7 Picture Index Picture 1 1 Outer Dimensions 7 Picture 1 2 Loading Capacity 8 Picture 2 1 Working Principle 12 Picture 2 2 Photoelectrical Sensor 13 Picture 3 1 Installation Metho...

Страница 5: ...dust cleaning device 1 1 Coding Principle 1 2 Main Features Stainless steel hopper motor overload protective device When it is installed in the feeder of the molding machine it shall be used with the...

Страница 6: ...o avoid personal injury and damage to machine We shall not be liable for any damage caused by unauthorized change of the machine Our company provides excellent after sales service Should you have any...

Страница 7: ...Hz 200 220 300 330 Hopper capacity L 3 6 Input voltage 3 400VAC 50Hz Material level control Microswitch Cloth filter Standard Auto cleaning Standard Dimensions H mm 660 735 W mm 310 350 D mm 430 455 W...

Страница 8: ...8 29 1 3 2 Loading Capacity Picture 1 2 Loading Capacity...

Страница 9: ...g transportation to prevent improper functioning 3 The structure of the machine is well balanced although it should also be handled with care when lifting the machine for fear of falling down 4 The ma...

Страница 10: ...any more unplug the power supply and dispose of it properly according to local code Fire hazard In case of fire CO2 dry powder fire extinguisher should be applied 1 5 Exemption Clause The following st...

Страница 11: ...11 29 including adding or replacing accessories dismantling delivering or repairing 4 Employing consumables or oil media that are not appointed by Shini...

Страница 12: ...ials 7 Microswitch 8 Discharging plate After starting the machine blower 1 works it makes the storage hopper 5 generate the vacuum discharging plate 8 closed materials in the silo enter into the stora...

Страница 13: ...trical Components Description 2 1 1 Microswitch It is used to give control signals to make the motor start working after discharge of the material Picture 2 2 Photoelectrical Sensor 1 3 To be connecte...

Страница 14: ...460 1 Notes for Installation and Positioning 1 Machine just can be mounted in vertical position Make sure there s no pipe fixed structure or other objects above the installing location and around the...

Страница 15: ...430 460 series 400V model please connect it with AC 3 400V 50Hz power supply and earth wire Please make sure that the main power is shut off when you connect the machine with power supply 3 2 Install...

Страница 16: ...16 29 4 Application and Operation 4 1 Control panel description Pic 4 1 Description of operation panel keys...

Страница 17: ...eters Move the menus down and reduce the value Move the menbus up and increase the value FULL MAT LIGHT It means full materials in the hopper It means the machine is mixing the materials in the hopper...

Страница 18: ...cation Code Status Parameters Preset value Range F 01 Suction action time Motor suction time when there s a shortage of materials which is also the vacuum breaking valve s working time Corresponding a...

Страница 19: ...F 06 Setting time of cleaning before suction Set 0 as the no screen cleaning before suction Corresponding action R01 0 secs 0 99 secs F 07 Setting time of screen cleaning after suction Set 0 as no sc...

Страница 20: ...otor working time and clear the time The method to clear the motor working time Set the setting value as 0 and press ENT key to cancel 0 unit 10 hrs 0 999 Only 0 means clearing the time 4 3 Alarm Prog...

Страница 21: ...e F 30 Comm address 1 1 99 F 31 Baud rate 0 19200 1 9600 2 4800 1 0 2 F 32 Odd even check 0 No test 1 Odd parity 2 Even parity 0 0 2 4 5 Operaton Procedure Description 4 5 1 Operation Procedure Panel...

Страница 22: ...99 secs N03 Waiting for material circulating suction F 09 0 secs 0 9990 secs P Waiting for suction confirmation 4 5 2 Data Resetting 1 Turn off the machine plate power 2 Short circuit the two termina...

Страница 23: ...action time R W 15 5 127 S 4 Screen cleaning action cycle R W 10 1 99 6 Screen cleaning setting time R W 0 99 S 7 Discharge checking time R W 10 5 99 S 8 Standby time after motor running R W 0 0 99 S...

Страница 24: ...aning setting time after suction R W 5 0 99 S 23 Discharge checking time R W 10 5 99 S 24 Material shortage counting alarm R W 3 1 9 time s 25 Material shortage counting stop alarm R W 3 Mat shortag e...

Страница 25: ...2 suction output 0 no output 1 output bit 3 vacuum breaking output 0 no output 1 output bit 4 mixing output 0 no output 1 output bit 5 spraying valve output 0 no output 1 output bit 6 alarm output 0 n...

Страница 26: ...shortage Material is used up Add material to storage bin Leakage in conveying hose Lock up or replace conveying hose Filter is blocked Clear up filter screen Motor does not work Short of phase or mot...

Страница 27: ...ver take down the hopper cover take out the filter bag Remove all the dusts and sundries collected on the filter screen to ensure stable airflow passed through it which to improve the suction ability...

Страница 28: ...be replaced after a period of time The fans covers and metal screen also need to be replaced when necessary Note Cut off main power when checking the electrical wire 6 2 Storage Hopper 1 Loose the sna...

Страница 29: ...current One phase A Three phase A Check phase sequence of power supply 6 4 3 Daily Checking Check main power switch Check filter screen Check motor performance 6 4 4 Weekly Checking Check if there are...

Отзывы: