18(33)
3. Installation and Debugging
This series of models only could be applied in working environment with good
ventilation.
Notice
!
Read this chapter carefully before installation of the machine. Install the
machine by the following steps.
Power supply should be fixed by qualified technicians!
3.1 Install the equipement on dryers or molding machines.
3.1.1 Installation of SAL-U (-A)
Picture 3-1: Installation of SAL-U (-A)
Install the Hopper Loader (SAL-U) on a hopper dryer (refer to the above drawing)
by fastening the screws on the hopper base. Connect one end of the conveying
pipe with material inlet (A) and the other end with suction pipe (B). Then insert the
end with suction pipe B into the storage tank.
3.1.2 Power Supply of SAL-U (-A)
Connect SAL-1.5U / 3U / 6U / 12U-(A) with AC 1
Φ
230V, 50 Hz power supply and
earth wire.
Содержание SAL-12U
Страница 1: ...SAL U Series Self contained Hopper Loader Date Dec 2018 Version Ver B English...
Страница 2: ......
Страница 6: ...6 33...
Страница 32: ...32 33 1 Check if it s in poor contact 2 Please replace a new switch if it s damaged...