5(33)
Table 1-2: Hopper Base Installation Size Table ................................................ 11
Picture Index
Picture 1-1: Dimensions .................................................................................... 10
Picture 1-2: Hopper Base Installation Size ....................................................... 11
Picture 1-3: Loading Capacity ........................................................................... 11
Picture 2-1: Working Principle of SAL-U-(CA) .................................................. 14
Picture 2-2: Working Principle of SAL-U-E(EA) ................................................ 15
Picture 2-3: Photoelectric Switch ...................................................................... 16
Picture 2-4: Magnetic Proximity Switch ............................................................. 16
Picture 2-5: Air Accumulator ............................................................................. 17
Picture 3-1: Installation of SAL-U (-A) ............................................................... 18
Picture 3-2: Installation of SAL-U-E (A) ............................................................ 19
Содержание SAL-12U
Страница 1: ...SAL U Series Self contained Hopper Loader Date Dec 2018 Version Ver B English...
Страница 2: ......
Страница 6: ...6 33...
Страница 32: ...32 33 1 Check if it s in poor contact 2 Please replace a new switch if it s damaged...