46(51)
cooler fan and copper pipe should be dried with compressed air.
4) Make the cooler's upper and lower cover junction clean enough
and smear the silica gel then fixed the covers with screws.
5) Put the cooler on the air at least 4 hours to make the silica gel drying
enough then fix the cooler on the chiller and connect all pipes.
6.6 Dewpoint Monitor (Option)
6.6.1 Installation for Dewpoint Monitor
1) Cut off the film on control panel. Slightly cut it with the blade as there
reserved with the holes.
Picture 6-5: Hole Site
2) Check if there are complete parts for dewpoint monitor including:
Dew-point monitor
Dew-point transmitter assembly (dew-point detector, detection cable, washer
and installation guide)
Copper joint, installation seat for dew-point monitor
Picture 6-6: Parts of Dew-point Monitor
Содержание 4SDD-50U/200H
Страница 1: ...SDD Series Dehumidifying Dryer Date Oct 2018 Version Ver F English...
Страница 2: ......
Страница 41: ...41 51 6 Maintenance and Repair...