37
13VT-N100
13VT-N150
13VT-CN10
INSTALLING THE SHIFTER
Figure 1-42.
Capstan
D.D. motor
Drum
Reel pulley
(Bottom side of mechanism chassis)
Sifter
Phase-Matching
point
2
Insert
point
1
Half round notch
Shaft
1
Round mark
Loading gear (T)
Insert
point
3
Insert
point
2
Insert
point
4
Insert
point
6
Release
point
3
Shaft
1
Shaft
1
Shaft
4
1. Make sure that the loading gear is at the point
1
as
shown below.
2. Install, paying attention to
6
insertion points and
3
release points.
3. For the phase matching at the insertion point
1
, see
the point
2
as shown below.
4. Finally fix the inserts
1
and
4
.
Figure 1-43.
Rotation
point
2
Phase-matching
point
1
Содержание 13VT-CN10
Страница 55: ...57 13VT N100 13VT N150 13VT CN10 56 12 11 10 9 8 7 6 5 4 3 2 1 A B C D E F G H BLOCK DIAGRAM OF TV SECTION ...
Страница 61: ...69 13VT N100 13VT N150 13VT CN10 68 12 11 10 9 8 7 6 5 4 3 2 1 A B C D E F G H OVERALL SCHEMATIC DIAGRAM ...
Страница 69: ...83 6 5 4 3 2 1 A B C D E F G H 13VT N100 13VT N150 13VT CN10 PWB C POWER Unit Wiring Side ...
Страница 70: ...84 6 5 4 3 2 1 A B C D E F G H 13VT N100 13VT N150 13VT CN10 PWB A MAIN Unit Wiring Side ...
Страница 71: ...85 6 5 4 3 2 1 A B C D E F G H 13VT N100 13VT N150 13VT CN10 PWB A MAIN Unit Chip Parts Side ...