8
Rigging process using the SGM Omega bracket
Start the standard rigging process by blocking the lower working area, and make sure the work is performed from a stable platform.
1.
Check that the clamp/bracket is undamaged and can bear at least 10 times the weight
of the fixture. Check that the structure can bear at least 10 times the weight of all
installed fixtures, lamps, cables etc.
2.
Bolt the clamp/bracket securely to the omega bracket with a M12/ ½ bolt (min. grade
8.8 C5M) and a lock nut.
3.
Align the omega bracket with the G-1 Beam base. For standard Omega Bracket,
insert the fasteners into the G-1 Beam base bracket, and turn both levers a full 1/4
turn clockwise to lock. When using the POI Omega Bracket, insert the included M-10
screws through the bracket holes and tighten them with a M-10 key until they are fully
attached to the base.
4.
Working from a stable platform, hang the fixture on a truss or other structure. Tighten
the clamp/bracket.
5. Install a safety wire that can bear at least 10 times the weight of the fixture. The safety
wire attachment point is designed to fit a carabiner AISI316 grade.
6.
Verify that there are no combustible materials, cables, or surfaces to be illuminated
within 0.3 m (12 in.) of the fixture.
7.
Check that there is no risk of the head/yoke colliding with other fixtures or structures.
WARNING! Always secure an elevated fixture with a safety wire
Fasten a safety wire (not shown) between the load-bearing support structure and the safety wire attachment point on the device.
The safety cable (not included in the package) must:
•
Bear at least 10 times the weight of the device (SWL).
• Have a minimum gauge of 4 mm.
•
Have a maximum length (free fall) = 30 cm (12 in.).
CAUTION!!
•
Always use a safety wire of a grade AISI 316 steel.
• Make sure the slack of the safety wire is at a minimum.
• Never use the yoke or the carrying handles for secondary attachment.
Figure 4: Installing the G-1 Beam
Figure 5: Safety wire attachment point
Holes for Omega Bracket
All SGM luminaries have locking points in the base for installation and rigging. In both
standard and POI fixtures, the distance between the points from center to center is
always 106 mm. While the base of the standard G-1 Beam fixture include 1/4 turn
fasteners camlocks to mount the omega brackets, the POI products come with M-10
nuts for M-10 screws.
The G-1 Beam (POI) may be installed in any orientation, with or without base, on the
ceiling or on a wall surface.
Always use the supplied omega brackets to rig a standard G-1 Beam. Lock the bracket
with the 1/4-turn fasteners.
N.B.: The 1/4-turn fasteners are only locked when turned fully clockwise.
Depending on the structure, please use appropriate and secure methods for mounting the Omega bracket.
PLEASE NOTE!!
The supplied omega bracket is not rated for POI (Permanent Outdoor Installation C5-M rated material). See more about
“Installation and rigging the G-1 Beam POI” on page 25.
Installing / rigging the G-1 Beam
106 mm
[ 4,2in ]
Ø 18 mm
[ 0,7in ]
Figure 3: SGM locking points
Safety wire attachment points
Содержание G-1 BEAM
Страница 1: ...USER MANUAL MOVING HEADS SERIES G 1 BEAM G 1 BEAM POI ...
Страница 30: ...30 User Notes ...
Страница 31: ...31 User Notes ...
Страница 32: ...32 SGM Light A S Sommervej 23 8210 Aarhus V Denmark Tel 45 70 20 74 00 info sgmlight com www sgmlight com ...