OVERPRESSURE LEAK DETECTOR DLR-GS ..
10/09/2014
- 4 -
Optionally, an additional relay can be used for potential-free contacting when the pressure falls
below the "Feed required" point. The pressure value for "Feed required" is about 1 bar above
the switching value "Alarm ON".
3.4. Pressure relief valve
The leak detector is not designed with a safety valve, but one can be added if the application
requires it. (Please consult the manufacturer).
3.5. Description of the display and control elements
3.5.1 Display element states (signal lamps)
Signal lamp
Operating
status
Feed required
(optional)
Alarm
status
Alarm, acoustic
alarm signal
acknowledged/reset
Device
fault
OPERATION:
green
ON ON ON
ON
ON
ALARM:
red
OFF OFF ON FLASHING ON
FEED:
yellow
OFF ON ON
ON
OFF
3.5.2 Operating functions via pushbuttons
Switching off the acoustic alarm signal:
Briefly press the "Acoustic alarm" button once – the acoustic alarm signal is then switched
off and the red LED flashes.
Pressing the button again will cause the acoustic signal to be switched on.
This function is not available in normal operation or during malfunctions.
Testing the visual and acoustic alarm signal
Press the "Acoustic alarm" button and keep it pressed (approx. 10 seconds) – the alarm
signals are triggered until the button is released again.
This test is only possible if the pressure in the system has exceeded the "Alarm OFF"
pressure level.
Содержание DLR-GS PMN Series
Страница 17: ...88 88 57 57 13 04 2007 M1 075 000 45 71 69 01 09 06 2 14 05 77 25 19 bar 0 16 10 bar 0 100 200 300 02 99...
Страница 18: ...99 99 57 57 88 88 88 76 30 02 13 04 2007 M2 075 000 14 05 77 25 19 bar 0 16 10 bar 0 100 200 300 06 2...
Страница 19: ......
Страница 20: ......
Страница 24: ...28 06 2005 Drilling Dimensions 200 300 260 220 T 140 8...