OVERPRESSURE LEAK DETECTOR DLR-GS ..
10/09/2014
- 12 -
6.5. Alarm / fault
(1) In the event of an alarm, the red signal lamp lights up and the acoustic signal sounds
(2) Switch off the acoustic signal.
(3) Contact the installation company immediately.
(4) Determine and rectify the cause for the alarm, then perform a functional test of the leak
detection system as described in section 6.4.
(5) In the event of a fault, the red signal lamp lights up and the acoustic signal cannot be reset.
Notify the manufacturer.
7. Disassembly
The following points are particularly important for the disassembly of systems which pose an
explosion hazard.
Applicable regulations for the disassembly of electrical systems must be followed.
Check that no gas is present before and during the work.
Seal any openings gas-tight which could otherwise allow the spread of an explosive
atmosphere.
Do not use electrical equipment capable of generating sparks (saw, cutting grinder...) for
disassembly. If this is unavoidable, ensure compliance with EN 1127.
Use low-sparking tools.
Avoid any build-up of electrostatic charge (e.g. due to friction).
Contaminated components (potential outgassing) should be disposed of appropriately.
8. Identification
Electrical
data
Serial
no.
Type
designation
Date of manufacture (month / year)
Manufacturer’s
code
Legally required symbols/marks
The connecting line(s) can be connected to areas for which category 3 devices (Group II
(G)) are required (T1 to T3; IIA to IIB).
9. Abbreviations
01
Signal lamp – "Alarm" – red
02 Stop
cock
2.1
Stop cock, venting
2.2
Stop cock, pressing
6.1
Connection, test device
Содержание DLR-GS PMN Series
Страница 17: ...88 88 57 57 13 04 2007 M1 075 000 45 71 69 01 09 06 2 14 05 77 25 19 bar 0 16 10 bar 0 100 200 300 02 99...
Страница 18: ...99 99 57 57 88 88 88 76 30 02 13 04 2007 M2 075 000 14 05 77 25 19 bar 0 16 10 bar 0 100 200 300 06 2...
Страница 19: ......
Страница 20: ......
Страница 24: ...28 06 2005 Drilling Dimensions 200 300 260 220 T 140 8...