www.sentera.eu
MIW-MCS-1-LCD-EN-000 - 20 / 07 / 2016
10 - 33
Fig 5 Mounting dimensions
Fig 6 Mounting position
115
201
63
140
102
4x
4,50
Acceptable
Not acceptable
8
Close the enclosure and fix the cover.
9
Switch on the power supply.
ATTENTION
If an AC power supply is used with any of the units in a Modbus network the
GND terminal should NOT BE CONNECTED to other units on the network or
via the CNVT‑USB‑RS485 converter. This may cause permanent damage to the
communication semiconductors and / or the computer!
10
If necessary, customize the other factory settings to the desired ones. Use
3SModbus software, 3SMonitor software or the 4-button menu and LCD display
VERIFICATION OF THE CORRECT INSTALLATION
When you first switch on the power supply, the display will illuminate and show the
time and date, Temp. °C (the default operational mode) and the active working mode
(Run or Stand-by). If this is not the case, open the enclosure and check the status of
the power on green LED. See
Fig 7
Operating indication
.
■
If the LED is off, your unit is not supplied. Check the connections again.
■
If the LED is on, but the LCD display is off, check the connection of the ribbon
(flat) cable.
Fig 7 Operation indication
ATTENTION
Be careful when you are handling with the ribbon cable. It must not touch the
power supply block. This will damage your unit. See
Fig 8
.
MCS-1-LCD
MULTIFUNCTIONAL LOGIC
CONTROLLER