Installation recommendations
FP400 Product Guide
Page 29
Selecting conduit for below ground bypasses
When the sensor cable must go below ground to reach the other side of a gate, or go through or
below a building or object, the cable must be protected by using conduit. For sites that include
periods of freezing weather, solid wall conduit is required. For sites in temperate climates that do
not experience freezing weather, split conduit can be used.
Figure 24 Split wall conduit
Figure 25 Solid wall conduit
Figure 26 Conduit fittings
split wall conduit
split wall conduit couplers
split wall conduit sweeps (not elbows)
flexible solid wall conduit is required for areas with freezing temperatures
water tight rain plugs are required for conduit
use cement at joints for solid wall conduit