myGrid Installation Notes
Introduction
myGrid kits provide an easy to install, compliant, Solar Hybrid (On-Grid) or Off-Grid battery
system.
These installation notes outline all the processes required to effectively install each of the
myGrid kit configurations helping the installer to gain the most benefit from using a myGrid kit.
myGrid Installation Overview
There are two major parts to each kit:-
SP PRO or SP PRO GO Interactive Inverter Charger
Battery Enclosure including side mounted DC switchbox
The battery enclosure is designed to sit on the floor and the SP PRO or SP PRO GO is wall
mount. Connection points between these two parts have been designed to allow flexibility in
positioning to suit many varied locations.
The battery enclosures in the myGrid kit are modular and each section is called a frame. Each
frame can hold four myGrid batteries. The picture above is a two frame battery enclosure plus
left hand mounted DC Switchbox. The DC Switchbox contains the main battery circuit breaker
and the precharge/battery sense circuit breaker under a protective cover and can be mounted
on either the left hand side or the right hand side of the battery enclosure.