Garden
Shed
2.3 x 2.3 x 2.4m
11Q
26M
26N
11P
11P
41K
11Q
41J
23A
42A
26L
26P
66
23A
26M
26L
Step 5:
Assemble the front wall panels
Fix parts 41J and 41K (jamb) to parts 11P and 11Q (sheeting) with self-tapping screws as per diagram below.
NOTE:
All
screws marked with a cross should not be fixed at this stage. Make sure the small lip on the channel is always facing out.
This ensures rain water cannot build up inside your shed.
Fix parts 26P, 26N (top channels), 42A (jamb), 26L, 26M, and 23A (bottom channels) with self-tapping screws. Enhance
the top channels by applying part 66 (channel connector).
ROOF TOP EDGE
ROOF TOP EDGE
RIDGES FACING UP
RIDGES FACING UP
GSS2323/G | Issue:2(SP) 13/04/17
Original Language Version
© Jack Sealey Limited
Step 5:
Assemble the front wall panels.
Fix parts 41J and 41K (jamb) to parts 11P and 11Q (sheeting) with self tapping screws as per diagram below. Note: All screws marked with a
cross should not be fixed at this stage. Make sure the small lip on the channel is always facing out. This ensures the rainwater can not build up
inside the shed.
F
ix parts 26P, 26N (top channels), 26L, 26M and 23A (bottom channel) with self tapping screws. Enhance the top channels by applying part 66
(channel connector).