Garden
Shed
2.3 x 2.3 x 2.4m
66
66
34R
34L
9F
26J
26K
26B
26A
9F
9F
Step 3:
Assemble side wall panels
Place 3 x parts 9F (sheeting) on your worktable and join together with self-tapping screws as per the diagram. Now fit parts 26K, 26J
(top channels) and parts 26A, 26B (bottom channels) to the sheeting by tapping or sliding it in. Make sure the small lip of the channel is
always facing out. This ensures rainwater cannot build up inside your shed. Make sure parts 26K and 26J are used as top side channels.
Now fix parts 34R and 34L (mid wall channels) to the sheeting with self-tapping screws. Please note the groove should face downwards.
Fix other channels using self-tapping screws through both sides of the connectors and enhance the strength by applying part 66 (channel
connector).
NOTE:
Screws are applied to both sides of the connectors. All screws marked with a cross should not be fixed at this stage.
ROOF TOP EDGE
RIDGES FACING UP
Step 3:
Assemble the side wall panels
P
lace 3 x parts 9F sheeting on your work table and join together with self tapping screws as per the diagram. Now fit parts 26K, 26J (top
channel) and parts 26A, 26B (bottom channels) to the sheeting by tapping or sliding it in. Make sure the small lip of the channel is always facing
out. This ensures rainwater can not build up inside the shed. Make sure parts 26K and 26J are used as top side channels.
N
ow fix parts 34R and 34L (mid wall channels) to the sheeting with self tapping screws. Please note the groove should face downwards.
F
ix other channels using self tapping screws through both sides of the connectors and enhance the strength by applying part 66 (channel
connector).
N
ote: Screws are applied to both sides of the connectors. All screws marked with a cross should not be fixed at this stage.
GSS2323/G | Issue:2(SP) 13/04/17
Original Language Version
© Jack Sealey Limited