INSTALLATION
MANUAL
Product:
Document
#:
Rev:
Page:
MODEL
5500
GYRO
90214
2
5
of
5
Section
3:
COOLING
INSTALLATION
3.3
Connecting
Seawater
to
Heat
Exchanger
1)
Connect
seawater
from
installer
supplied
pump
to
lower
3/4”
(19
mm)
hose
barb
on
heat
exchanger.
Use
the
same
practices
as
other
below
waterline
seawater
plumbing.
Required
flow
rate
is
4
GPM
(16
LPM)
minimum
and
8
GPM
(30.3
LPM)
maximum.
2)
Connect
seawater
discharge
(upper
hose
barb)
to
overboard
drain.
Use
the
same
practices
as
other
below
waterline
seawater
plumbing.
3)
In
addition
to
initial
operation
at
dock,
new
gyro
installations
should
be
checked
for
minimum
4
GPM
(16
LPM)
flow
while
vessel
is
at
speed
and
when
backing
down.
If
no
other
method
of
confirming
flow
is
available,
discharge
line
may
be
temporarily
diverted
to
a
bucket.
Flow
is
calculated
from
time
to
fill
a
known
volume.
4)
Inspect
raw
water
plumbing
after
sea
trial
for
any
signs
of
leakage.
5)
Heat
exchanger
contains
removable
end
‐
caps
to
provide
access
for
cleaning
the
tube
bundle.
FIGURE
4
–
MODEL
5500
SEAWATER
CONNECTIONS
Содержание 5500 GYRO
Страница 1: ...Rev 2 JULY 2013 INSTALLATION MANUAL MODEL 5500 GYRO...
Страница 2: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 4: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 20: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 40: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 42: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 44: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 48: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 58: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Страница 62: ...THIS PAGE INTENTIONALLY LEFT BLANK...