![SEA MARK TANK E 270 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/sea/mark-tank-e-270/mark-tank-e-270_installation-manual-and-security-information_1220784008.webp)
POSITIONING OF THE FRONT BRACKET
Once the operator is attached to the post and the leaf set in the closed position execute the following
operations:
1.
Release the operator (as in fig. 25)
2.
Pull-out completely the chromate shaft and
push it back in 1cm
3.
Attach the shaft to the front bracket (Fig. 13)
4.
Set the operator perfectly levelled and mark the position of the front bracket (Fig.12)
Attention:
avoid the welding of the front bracket to the shaft of the hydraulic operator already attached;
the welding scraps (daps) could ruin the chromium plating of the shaft.
Fig. 13
Fig. 12
Front bracket welded
Front bracket screwed
Fig. 14
Fig. 15
70 mm
70 mm
6
m
3,5 m
46 mm
WELDING OF THE FRONT BRACKET TO THE GATE
The front bracket must be positioned so that the operator is perfectly levelled
According to the nature of the gate the front bracket (wood, steal, Aluminium) can be:
Sistemi Elettronici
di Apertura Porte e Cancelli
International registered trademark n. 804888
®
8
English
English
REV 00 - 07/2013
67410019
MARK TANK E