SEA JOINT Скачать руководство пользователя страница 6

6

The first thing to check is that the gate is in good running order:

A - 

The gate is rigid and straight and runs smoothly throughout its travel

B - 

The length of each leaf must comply with max. length indicated on technical specifications of the model

C - 

The weight of each leaf must comply with max. weight indicated on technical specifications of the model

D - 

The hinges are hardly anchored and are able to support the torque of the operator; they do not have irregular 

movements and/or any friction during the whole movement of the leaf.

-

 

SEA operators have been designed for the automation of gates for vehicles use only

Be aware to avoid the crossing of the gate path because it is very dangerous for pedestrians

- Install the warning signs on each side of the gate and in avisible zone

 to inform the pedestrians 

about the danger they run when passing or resting in the environment of the gate

For more safety SEA advises to install infrared photocells

GATE WARNINGS AND PRECAUTIONS

SALES CONDITIONS and WARRANTY

GENERAL WARNING:

 Installation must be realized using parts and accessories approved by SEA. SEA is not responsible for incorrect 

installations and/or non-compliance with safety standards according to the law in-force. SEA is in no way liable for any damages and/or 
malfunctioning due to using parts and accessories non-compliant with the UL325 safety standards.

ORDERS:

 Orders are processed upon approval by SEA. Buyers must confirm orders by sending a written Purchase Orders to SEA. Purchase 

Orders are intended as confirmation of orders and binding for the buyer, which accepts SEA sales condition.
 

QUOTATION:

 Quotation and special offers with a non-specified duration expires automatically after 30 days.

PRICES:

 Prices are based on the Price List in force. Discounts and quotation from Sales Rep. and other selling branches must be approved by 

SEA. Prices are F.O.B SEA Warehouse in Miami and do not include shipments costs. SEA reserves the right to modify the price list at any time 
and provide notice to its sales network.

PAYMENT: 

Method of payments and terms are notified by SEA and displayed on the commercial invoice. 

DELIVERY:

 The delivery time on the invoice is not binding and represents an estimated delivery. Shipments costs will be charged to the buyer 

and SEA is not responsible for delays and/or damages occurred to the products during shipment.

COMPLAINS: 

Complains and/or claims must be notified to SEA within 7 business days after receiving the products. Claims and complains must 

be supported by original documents. Customer must contact the factory for instructions and authorization. Merchandise returned for credit must 
be current, uninstalled and unused and returned in its original packaging. Freight must be pre-paid on all authorized returns.

REPAIRS:

 Repairs and parts are subject to the availability in stock. Shipment of products for repairs must be pre-paid by the customer. Products 

shipped without authorization, sender’s details and description of the problems will be refused. Customers must contact SEA for instructions. 

WARRANTY: 

for  the  original  buyer  only:  Hydraulic  and  oil-bath  motors:  36  months  warranty  from  the  date  of  invoice  on  manufacturing, 

assembling and workmanship defects. Electro-mechanic motors and electronic control systems: 24 months warranty from the date of invoice on 
manufacturing, assembling and workmanship defects. Lepus and Full Tank Standard model: 60 months warranty from the date of invoice on 
manufacturing, assembling and workmanship defects. No warranty will be recognized for damages due to incorrect installation and/or improper 
use for which the product was intended. SEA warranty obligations shall be limited to repair or replace the defective product/parts at SEA option, 
upon examination of the products by SEA technical Staff. All replaced parts must remain property of SEA. The warranty status of the product 
remains an unquestionable assessment of SEA. Buyer must ship pre-paid defective products. Products under warranty will be returned pre-paid 
by SEA. Recognized defects, whatever their nature, will not produce any responsibility and/or damage claims to SEA USA Inc and SEA . 
Warranty shall not cover any required labor activities. Warranty will in no case be recognized if alterations and any other changes will be found on 
products.  Warranty  will  not  cover  damages  caused  by  carriers,  expendable  materials  and  faults  due  to  improper  use  with  the  products 
specifications. No indemnities are recognized during repairing and/or replacing of the products under warranty. SEA USA Inc. and SEA decline 
any responsibility for damages to person and objects deriving from non-compliance with safety standards, installation instructions or use of the 
products sold. It is intended that warranty will be recognized only on products bought through the SEA authorized network. Products must be 
installed by professionals. No warranty will be recognized if products are installed directly by the final user. Warranty does not apply in case of 
unexpected events such as fire, flood, electrical power surge, lightning, vandalism and others. 
SEA USA Inc. is not responsible for errors in technical information printed in catalogs and installation manuals. 

INSTALL THE OPERATOR IN THE CORRECT POSITION

DO NOT INSTALL THE FRONT BRACKET IN A WEAK PART OF THE GATE

NOT FOR PEDESTRIAN OPENING!

INSTALL THE WARNING SIGNS!

Содержание JOINT

Страница 1: ...UPER FULL TANK 20 40 HYDRAULIC OPERATOR FOR SWING GATE REV 03 11 2020 SEA USA Inc 10850 N W 21st unit 160 DORAL MIAMI Florida FL 33172 Phone 1 305 594 1151 Toll Free 800 689 4716 www sea usa com 67411857 ...

Страница 2: ...operator 10 In case of break down or malfunctioning of the product disconnect from the main power source Do not attempt to repair or intervene directly contact only qualified personnel for repair 11 Failure to comply with the above may create a situation of danger 12 All cleaning maintenance or repair work must be carried out by qualified personnel 13 In order to guarantee that the system works ef...

Страница 3: ...d where applicable IMPORTANT INSTALLATION INSTRUCTIONS 1 Install the gate operator only when a The operator is appropriate for the construction of the gate and the usage Class of the gate b All openings of a horizontal slide gate are guarded or screened from the bottom of the gate to a minimum of 4 feet 1 22 m above the ground to prevent a 2 1 4 inch 57 2 mm diameter sphere from passing through th...

Страница 4: ...uction SEA USA Inc can not be deemed responsible for any damage or accident caused by product breaking being damages or accidents due to a failure to comply with the instructions herein The guarantee will be void and the manufacturer responsibility will be nullified if SEAUSAInc original spare parts are not being used The electrical installation shall be carried out by a professional technician wh...

Страница 5: ...placement of external devices but they give only examples of suggested entrapment protection in their installation manuals If the installer identifies a risk of entrapment or obstruction at least two independent means of entrapment protection are required 4 TERMINOLOGY CHANGE The terms primary and secondary have been removed in the description of entrapment protection devices This was done to emph...

Страница 6: ... the factory for instructions and authorization Merchandise returned for credit must becurrent uninstalledandunusedandreturnedinitsoriginalpackaging Freightmustbepre paidonallauthorizedreturns REPAIRS Repairsandpartsaresubject totheavailability instock Shipmentofproducts forrepairs must bepre paidbythecustomer Products shippedwithoutauthorization sender sdetailsanddescriptionoftheproblemswillberef...

Страница 7: ...se of the electric lock on operators without block SB moreover the exclusion of electronic slowdown is recommended in case of operators with hydraulic slowdown 5 Cylinder 6 Electric motor 7 Hydraulic pump 8 Electric cable 29 53 ft 70 40 Fig 2 SUPER FULL TANK 20 G6 380V SFT 20 G6 380V SUPER FULL TANK 20 G6 120V SFT 20 G6 120V Fig 1 19 69 39 37 4 33 2 64 61 81 100 79 60 04 100 55 SUPER FULL TANK 40 ...

Страница 8: ...rent Stroke Shaft speed Cycles per hour at 68 F Max working pressure Operating temperatures Thermal protection Max Thrust Capacitor Weight rotection class P Max leaf lenght Opening degree of the leaf SUPER FULL TANK 20 G6 380V SUPER FULL TANK 20 G6 120V TECHNICAL FEATURES SUPER FULL TANK 40 G4 120V The frequency of use is valid only for the first working hour and at 68 F temperature If operator wo...

Страница 9: ...8 7 28 6 69 7 09 6 50 6 30 6 69 5 91 5 51 5 12 3 15 4 72 3 35 4 92 3 94 5 51 5 71 4 72 6 30 4 92 6 50 6 69 5 51 7 09 7 48 7 87 6 18 6 18 6 18 6 18 6 18 6 18 6 18 6 18 6 18 6 18 6 18 6 18 6 18 6 18 6 18 6 18 16 93 16 93 17 32 17 72 17 72 18 50 18 90 18 90 18 90 18 90 18 90 18 90 18 90 18 90 18 90 18 90 18 90 18 90 18 90 18 90 18 90 18 90 inches inches inches inches SUPER FULL TANK 20 SUPER FULL TAN...

Страница 10: ...loose the parts listed in Fig 5 2 For a proper operation it is important to place as the operator as the front and rear brackets in a perfectly horizontal position with the help of a level as shown in Fig 10 Level REAR BRACKET INSTALLATION PRELIMINARY NOTES Fig 10 REAR BRACKET INSTALLATION The rear bracket must first be cut by respecting the a dimension shown on page 9 then welded Fig 13 The rear ...

Страница 11: ...rocedure in Fig 34 and Fig 35 2 Pull out completely the chrome shaft then bring it back about 0 4 inches 3 Place the front bracket on the gate and place the shaft in the housing Fig 17 4 With the help of a level Fig 16 make sure that the operator is in a perfectly horizontal position then mark the front bracket position Fig 17 FRONT BRACKET INSTALLATION Level Fig 16 Fig 17 Fig 18 Fig 19 SCREWED FR...

Страница 12: ...l the successive adjustments of the valves eg periodic maintenance should be made by unscrewing completely the external manual release see page 13 then make adjustments as shown in Fig 25 The opening and closing forces transmitted to the gate by the motor pump assembly are regulated by adjusting two by pass valves the grey valve adjusts the opening pressure while the yellow valve adjusts the closi...

Страница 13: ...MENT The oil level should be measured with the shaft inserted into the operator The oil level must correspond to the level of the distributor surface OIL LEVEL Fig 31 Fig 33 Fig 32 DISTRIBUTOR LEVEL DISTRIBUTOR UNSCREW AND LIFT THE MANUAL RELEASE THREE PHASE CABLE CONNECTIONS 1 PHASE 1 U 2 PHASE 2 V 3 PHASE 3 W 4 MOTOR HEATING DETECTOR CONTACT NC 5 MOTOR HEATING DETECTOR CONTACT NC 6 GROUND YELLOW...

Страница 14: ... 2 Check the oil level the oil cap is under the manual release 3 Replace the hydraulic oil with the oil recommended by the producer 4 Check the function of the release 5 Check the function of the by pass valves 6 Check and grease the fixation pins 7 Check the integrity of the connecting cables 8 Check the function and the conditions of the mechanical stops in opening and closing where the mechanic...

Страница 15: ...l be void and the manufacturer responsibility will be nullified if original spare parts are not being used SEA USA Inc The electrical installation shall be carried out by a professional technician who will release documentation as requested by the Laws in force Packaging materials such as plastic bags foam polystyrene nails etc must be kept out of children s reach as dangers may arise Internationa...

Страница 16: ...SEA USA Inc 10850 N W 21st unit 160 DORAL MIAMI Florida FL 33172 Phone 1 305 594 1151 Toll Free 800 689 4716 www sea usa com sales sea usa com ...

Отзывы: