![Sea Tel 9711 C Скачать руководство пользователя страница 32](http://html.mh-extra.com/html/sea-tel/9711-c/9711-c_installation-and-operation-manual_1221299032.webp)
9711 C & Ku-Band TXRX
Installation
3-11
8.
Repeat caulking, closing and
cleaning the vertical flanges
until all of the upper panel
seams are closed.
9.
Remove tape from the vertical
seams.
10.
Apply a 3/8” layer of caulking
to the under-side of the
perimeter flange of radome
cap.
11.
(Outside person) Climb onto
the upper panel assembly,
have someone (third person
required only for this step)
hand the cap to the person on
top of the radome.
12.
Insert the cap into the top of
the radome with a twisting
rotation. This will evenly
spread the caulking and align
the bolt holes inside the
radome top (coordinate with
the person inside the
radome).
13.
(Inside Person) Install the
radome cap using the
provided hardware.
CAUTION: Do NOT over
tighten the hardware. Only
tighten until the fiberglass
STARTS to flex.
14.
Apply additional caulking to
fill gaps between the upper
panels and the cap.
15.
Clean off excess caulking.
16.
The upper section of the
radome is now complete.
17.
Place short pieces of 2”x4”
boards under the perimeter of
the radome top to raise it up
off of the ground.
18.
Attach radome lifting brackets
(PN 122848), or other lifting
arrangement, around the
bottom of the upper panel
assembly.
Содержание 9711 C
Страница 4: ......
Страница 10: ...Table of Contents x This Page Intentionally Left Blank ...
Страница 21: ...Site Survey 9711 C Ku Band TXRX 2 8 This Page Intentionally Left Blank ...
Страница 57: ...Configuring a Computer for the MXP 9711 C Ku Band TXRX 4 6 This Page Intentionally Left Blank ...
Страница 61: ...Setup Tracking Receiver VSAT 9711 C Ku Band TXRX 6 2 This Page Intentionally Left Blank ...
Страница 67: ...Setup Azimuth Trim IMA Ver 1 05 or greater 9711 C Ku Band TXRX 8 2 This Page Intentionally Left Blank ...
Страница 71: ...Setup Blockage RF Radiation Hazard Zones 9711 C Ku Band TXRX 9 4 This Page Intentionally Left Blank ...
Страница 77: ...Configuring The Satellite Modem Interface 9711 C Ku Band TXRX 10 6 This Page Intentionally Left Blank ...
Страница 81: ...Setup Targeting 9711 C Ku Band TXRX 11 4 This Page Intentionally Left Blank ...
Страница 91: ...Quick Start Operation 9711 C Ku Band TXRX 13 6 This Page Intentionally Left Blank ...
Страница 115: ...Drawings 9711 C Ku Band TXRX 19 2 This Page Intentionally Left Blank ...
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 144: ......
Страница 151: ......
Страница 152: ......
Страница 157: ......
Страница 159: ......
Страница 160: ......