Installation
9711 C & Ku-Band TXRX
3-8
6.
Open each seam wide enough
to install a good bead of
silicone caulk, apply Loctite
and then firmly tighten all of
the bolts in that seam (smaller
dual beads of caulking can be
applied from outside and
inside if you prefer).
7.
Clean excess caulking off of
the flange area (inside and
out). The empty caulking
tubes can be used to clean off
the excess caulk without
scratching the radome finish.
8.
Repeat caulking, closing and
cleaning the vertical flanges
until all of the lower panel
seams are closed.
9.
Remove the tape from the
vertical seams.
10.
The lower section of the
radome is now complete.
11.
Place short pieces of 2”x4”
boards under the perimeter of
the lower panel assembly to
raise it up off of the ground.
Содержание 9711 C
Страница 4: ......
Страница 10: ...Table of Contents x This Page Intentionally Left Blank ...
Страница 21: ...Site Survey 9711 C Ku Band TXRX 2 8 This Page Intentionally Left Blank ...
Страница 57: ...Configuring a Computer for the MXP 9711 C Ku Band TXRX 4 6 This Page Intentionally Left Blank ...
Страница 61: ...Setup Tracking Receiver VSAT 9711 C Ku Band TXRX 6 2 This Page Intentionally Left Blank ...
Страница 67: ...Setup Azimuth Trim IMA Ver 1 05 or greater 9711 C Ku Band TXRX 8 2 This Page Intentionally Left Blank ...
Страница 71: ...Setup Blockage RF Radiation Hazard Zones 9711 C Ku Band TXRX 9 4 This Page Intentionally Left Blank ...
Страница 77: ...Configuring The Satellite Modem Interface 9711 C Ku Band TXRX 10 6 This Page Intentionally Left Blank ...
Страница 81: ...Setup Targeting 9711 C Ku Band TXRX 11 4 This Page Intentionally Left Blank ...
Страница 91: ...Quick Start Operation 9711 C Ku Band TXRX 13 6 This Page Intentionally Left Blank ...
Страница 115: ...Drawings 9711 C Ku Band TXRX 19 2 This Page Intentionally Left Blank ...
Страница 121: ......
Страница 122: ......
Страница 123: ......
Страница 144: ......
Страница 151: ......
Страница 152: ......
Страница 157: ......
Страница 159: ......
Страница 160: ......