![SDLG LG918 Скачать руководство пользователя страница 81](http://html1.mh-extra.com/html/sdlg/lg918/lg918_operation-and-maintenance-manual_1220448081.webp)
Operation & Maintenance Manual
──
LG918 Wheel Loader
75
the surface each time when excavating the soil.
z
When driving the machine forward, shift the working equipment control lever backward and
forward slightly to reduce the resistance.
△
!
NOTICE
Keep the two sides of the bucket cutting into the material equally
to prevent only a single side working. Face the loader forward and
never let an angle exist between the front and rear frame.
(3)
Conveying Operation Without Truck
The loader must be used without a truck under the following conditions:
z
The ground is too soft and not level, and the truck can not be used.
z
When the transportation distance is within 500 meters, it is not economical to use a truck.
z
The transportation driving speed is determined by the road condition.
z
In order to get good visibility and stability, the bucket should be turned to its upper limit
location(bucket lift-arm touch the upper limited block) and keep the lower pin connection point
of lift-arm at the transportation position (400~500mm above the ground).
(4)
Dumping Operation
z
When dumping material on to trucks or into freight
yards, raise the lift-arm to the position (forward tilt
to the maximum position) where the bucket does not
touch the carriage or material pole. And operate
working equipment control lever to tilt the bucket
forward to dump. Part or all of the material can be
dumped by the lever control. Act slowly and gently
during dumping to prevent the bucket from striking the ground.
z
If the material sticks onto the bucket, move the working equipment control lever cyclically to
allow the bucket to tilt forward or backward to shake down the material.
z
After dumping, use the bucket to level equipment (if assembled). Rear tilt bucket to level position,
and operate the working equipment control handle to allow the lift arm to lower to prepare for
next operation.
(5)
Pushing Operation
Level the bucket to the ground, and push the accelerator
to move forward. If there is blockage during moving,
raise the lift arm a little and move forward continuously.
When operating the lift arm to lift or lower, operate the