Operation & Maintenance Manual
──
LG918 Wheel Loader
100
3.7
The maintenance principles listed above are the normal requirements. The maintenance time
should be determined by the closer one between the two the maintenance schedules. If the working
condition is very severe, please shorten the maintenance cycle and increase the maintenance times
according to the real conditions.
3.8 Replace the air-storage tank after 3 years of service.