After the condenser matrix is fully fitted to the mounting surface, hang the cover/fan assembly onto
its hinges.
With the cover/fan assembly open, connect the wires from the fan to the terminal block .
Note - Ensure that the wiring from the fan is routed through the plastic clip provided to prevent the
possibility of the wires becoming entangled in the fan blade.
Connect the wiring and the Pipework to the cooler following the instructions supplied with the cooler.
Recommended materials for heat dump to cooler connections.
Pipework - 15mm OD x 10mm ID COBRACOL tubing.
Cable - 1.5 mm sq., 2 core white PVC covered (no earth)
Insulation tubing - 3/8" or 1/2" ID
Use of the equipment.
This unit is intended for use in conjunction with cooling units manufactured by Scotsman
Beverage Systems Ltd.
It is designed to be connected at the end of the water/glycol recirculation lines as a means
of removing heat from the cooling system.
There are
NO
other recommended uses for this unit.
DISMANTLING DECOMMISSIONING PROCEDURE
a. Isolate the unit from the Base cooler or Glycol module electricity supply.
b. Disconnect the recirculating coolant inlet and Outlet pipes.
ADJUSTMENTS MAINTENANCE REQUIREMENTS
7