5 Acceptance and transport
EN Floor grinding machine DSM 450
20
4.2 Tilting the machine
Before tilting the machine, always make sure
that it is on an even, level floor surface!
1.
Disconnect the power plug [4, Fig. A] from the
mains.
2.
If necessary, activate the lever [8, Fig. A/E] and
empty the tank [5, Fig. A].
3.
Swivel and lock the guide handle [1, Fig. A/K]
into the stretched position (
!
Chapter 3.1).
4.
Tilt the machine and place it on the floor (Fig. K).
4.3
Installing and removing ETX diamond tools
The consistency of the surface to be ground deter
mines the type or composition of the tools to be used.
All ETX diamond tools authorised for this ma
chine are dismantled and mounted in the same
manner.
All tool holder discs must be equipped with dia
mond tools of the same type and the same
quantity. The heights of the diamond tools (de
gree of wear) must also be the same.
1.
Tilt the machine (
!
Chapter 4.2).
2.
Gently tap with a lump hammer to loosen the
tools [29, Fig. L] from the EXT tool holder
disc [30, Fig. L] and then remove.
3.
Insert new tools into the recess [31, Fig. L] of
the ETX tool holder disc and press firmly in the
direction of the arrow (use lump hammer if nec
essary).
!
Fig. M:
The standard position of the transport wheels
[11] is "A". If especially high tools are used, the
transport wheels must be mounted in the "B"
position.
4.
If applicable, mount the transport wheels in the
corresponding position.
5.
Set the machine upright, swivel and lock the guide
handle in standard position (
!
Chapter 3.1).
4.4 Mounting the ETX tool holder disc
1.
Tilt the machine (
!
Chapter 4.2).
2.
Push the ETX tool holder disc [30, Fig. L] onto
the guide bolts and screw tight with the central
fixing screw M8x20.
3.
Set the machine upright.
4.
Swivel and lock the guide handle in standard
position (
!
Chapter 3.1).
4.5 Cleaning the machine
Do not use high pressure cleaners to clean the
machine!
1.
Tilt the machine (
!
Chapter 4.2).
2.
Clean the machine and tools dry with a cloth or
suitable agents.
3.
Set the machine upright, swivel and lock the guide
handle in standard position (
!
Chapter 3.1).
4.6 Checking electrical components
Only suitably knowledgeable, qualified profes
sional electricians may perform work on any
electrical parts of the machine!
Risk of injury and fire due to faulty electrical
cables!
—
Check the mains cable and power plug regularly
for functional safety.
4.7 Final tasks
Either:
Shut down the machine
a.
Disconnect the power plug [4, Fig. A] from
the mains.
b.
If necessary, activate the lever [8, Fig. A/E]
and empty the tank [5, Fig. A].
Or:
—
Put the machine back into operation
(
!
Chapter 3.1 – page 18).
5 Acceptance and transport
Observe the safety instructions in Chapter 2!
5.1 Accepting the machine
The machine is delivered in a complete and pack
aged condition from the manufacturer.
1.
Unpack the machine and check the enclosed
delivery slip to make sure all parts have been
delivered.
2.
Check whether any items have been damaged
in transit.
3.
In case of damage, contact the transport com
pany immediately!
4.
Report any problems to the manufacturer imme
diately!
Complaints at a later date cannot be acknowl
edged!
Содержание 719100
Страница 3: ...3 1 11 Fig K 29 31 30 32 29 Fig L 14 Fig M 11 A B...
Страница 45: ...1 RU DSM 450 45 1 1 1 Schwamborn Ger tebau GmbH Schwamborn Ger tebau GmbH Schwamborn Ger tebau GmbH 1 2 7...
Страница 46: ...2 RU DSM 450 46 2 2 1 2 2 C...
Страница 47: ...3 RU DSM 450 47 Schwamborn 3 3 1 2...
Страница 52: ...6 RU DSM 450 52 6 4 A 20 B 21 B 22 C 17 B 4 3 49 a 1 A b RESET 16 B a 4 A b 7 53...
Страница 54: ...54...
Страница 55: ...55...
Страница 56: ......