![schmersal PSC1-C-10 Series Скачать руководство пользователя страница 73](http://html1.mh-extra.com/html/schmersal/psc1-c-10-series/psc1-c-10-series_installation-manual_1213105073.webp)
Installation manual
PSC1-C-10 Installation manual V2.6
Page 73 of 173
Version: 57E
4.3.4.2.4
Dual-channel switching relay output with external monitoring
- collective feedback
For safety applications from PL d according to EN ISO 13849-1, two relays are used in the PSC1-C-10-x
module and two external contactors.
Q4.1
Q4.2
Q5.1
Q5.2
L+
L-
X22
X14
I00
I01
I02
I03
I12
I13
T0
T1
X12
Dual-channel switching relay output with external monitoring
–
collective feedback
The two external monitoring contacts are connected in series, supplied with pulse signal T0 and read
by I00 (configured as EMU input). With increased requirements, it is to be noted that at least 1
switching process must take place at least every 24 hours.
Safety instructions:
•
An adequately high test rate is required to achieve PL e according to EN ISO 13849-1.
•
For applications with frequent demand for the safety shutdown, testing should be at short
intervals, e.g. at the start of the shift, 1x per week. However, a test should be undertaken
cyclically at least 1 x per year.
Содержание PSC1-C-10 Series
Страница 1: ...Installation manual for PSC1 modules Series PSC1 C 10 PSC1 C 10 SDMx PSC1 E 3x...
Страница 98: ...Installation manual PSC1 C 10 Installation manual V2 6 Page 98 of 173 Version 57E 2 I 09 3 I 10 4 I 11...
Страница 140: ...Installation manual PSC1 C 10 Installation manual V2 6 Page 140 of 173 Version 57E...
Страница 153: ...Installation manual PSC1 C 10 Installation manual V2 6 Page 153 of 173 Version 57E Example for a hazard analysis...